ANALISA PRODUKTIFITAS ALAT BERAT PADA PROYEK PEMBANGUNAN GEDUNG FAKULTAS SYARIAH DAN ILMU HUKUM IAIN TULUNGANGUNG

Authors

  • Aprilia Kaprina Fakultas Teknik Universitas Kadiri
  • Sigit Winarto Fakultas Teknik Universitas Kadiri
  • Yosef Cahyo Setianto Purnomo Fakultas Teknik Universitas Kadiri

DOI:

https://doi.org/10.30737/jurmateks.v1i1.136

Keywords:

Heavy Equipment, Efficiency, Time, Cost

Abstract

Heavy equipment is an essential factor in large-scale construction projects. Heavy equipment used in civil engineering is a tool used to assist humans in carrying out development work, and the analysis of the productivity of heavy equipment is calculated so that its use is more efficient in terms of time and operational costs. This project functions as a building for lecture activities, and the land has a total building area of 22,983 m 2. The types of heavy equipment used for earthwork and structural work are excavators, dump trucks, and tower cranes. Based on the results of the calculation of the heavy equipment productivity analysis, which includes earthworks and tower crane work structures, it is obtained the results of research on heavy equipment that are precise, short time. It can be used so that all heavy equipment can work optimally. Of the several combinations, Combination III is the most effective and time-efficient in completing excavation, stockpiling, and tower crane work structures, namely 2 Excavator units, 4 Dumptruck, and 1 Tower Crane. The time needed to do this job is 251.52 hours, with a heavy equipment cost of IDR 276,422,572.00 and the amount of human resource analysis of IDR 9,555,249,830.00.

Alat berat merupakan faktor penting di dalam proyek konstruksi berskala besar. Alat berat yang digunakan dalam ilmu teknik sipil adalah alat yang digunakan untuk membantu manusia dalam melakukan pekerjaan pembangunan dan diperhitungkan analisa produktifitas alat berat agar penggunaannya lebih efisiensi dari segi waktu dan biaya operasionalnya. Proyek ini berfungsi sebagai bangunan tempat untuk aktifitas perkuliahan dan tanah memiliki luas total bangunan sebesar 22.983 m 2 . Jenis alat berat yang digunakan untuk pekerjaan tanah dan pekerjaan struktur ialah Excavator, Dumptruck, dan Tower Crane. Berdasarkan hasil perhitungan analisa produktifitas alat berat yang meliputi pekerjaan pekerjaan tanah dan pekerjaan struktur kerja tower crane diperoleh hasil penelitian alat berat yang tepat, waktu yang singkat dan dapat digunakan agar seluruh alat berat dapat bekerja optimal. Dari beberapa kombinasi, di Kombinasi III yang paling efektif dan efisien waktu pelaksanaannya dalam menyelesaikan pekerjaan galian, timbunan dan pekerjaan struktur kerja tower crane yaitu 2 unit Excavator, 4 Dumptruck, dan 1 Tower Crane. Waktu yang dibutuhkan untuk melakukan pekerjaan tersebut adalah 251,52 jam dengan biaya alat berat sebesar Rp 276.422.572,00 dan jumlah analisa sumber daya manusia sebesar Rp 9.555.249.830,00.

References

A. I. Candra, “Analisis Daya Dukung Pondasi Strauss Pile pada Pembangunan Gedung Mini Hospital Universitas Kadiri,†Ukarst, vol. 1, no. 1, pp. 63–70, 2017.

A. I. Candra, A. Yusuf, and A. R. F, “Studi Analisis Daya Dukung Pondasi Tiang Pada Pembangunan Gedung Lp3m Universitas Kadiri,†CIVILLa, vol. 3, no. 2, pp. 166–171, 2018.

S. Limanto, “Analisis produktivitas pemancangan tiang pancang dengan jack in pile,†no. 2, pp. 167–176, 2009.

Cahyuni, “Analisa Produktivitas Alat Berat pada Proyek Pembangunan Badan jalan Tenggarong, Loa Kulu dan Loa Janan,†Tek. Sipil dan Arsit., vol. 4, no. 1, pp. 1169–1177, 2014.

S. N. Indonesia, “Tata cara perhitungan harga satuan pekerjaan pondasi,†p. 2836, 2002.

N. D. Setiawati and A. Maddeppungeng, “ANALISIS PRODUKTIVITAS ALAT BERAT PADA PROYEK PEMBANGUNAN PABRIK KRAKATAU POSCO ZONE IV CILEGON,†J. Konstr., vol. 4, no. 2, pp. 91–103, 2013.

J. F. Maquet, Construction methods and planning. 2002.

B. B. Kalengkongan, T. T. Arsjad, and J. B. Mangare, “ANALISA PERHITUNGAN PRODUKTIVITAS ALAT BERAT PADA PEKERJAAN PEMATANGAN LAHAN PEMBANGUNAN TOWER SUTET LIKUPANG - PANIKI,†E J. Unsrat, 2018.

R. A. Paulus Eric Noviyanti, “PROGRAM PERHITUNGAN EFEKTIVITAS WAKTU DAN BIAYA PEMAKAIAN TOWER CRANE,†J. Dimens. Pratama, vol. 2, no. 2, pp. 1–9, 2013.

W. Oetomo and Rudiansyah, “Perencanaan Penggunaan Alat Berat Dan Biaya (Studi Kasus Kegiatan Pembangunan Sekolah Terpadu Samarinda),†Fak. Tek. J. Untag, Sipil, vol. 7, no. 2, pp. 115–128, 2014.

N. H. Rezky, A. Wanim, and D. P. Retno, “Analisa Penggunaan Alat Berat Pada Pekerjaan Proyek Perkerasan Jalan Kebun Durian-Gunung Sahilan-Gunung Sari Kabupaten Kampar,†E J. Unsrat, vol. 14, no. April, pp. 1–22, 2014.

S. Bahri, I. R. Rahim, and A. S. Mustari, “ANALISA LIFE CYCLE COST ( LCC ) PENGADAAN ALAT BERAT DI TPA TAMANGAPA,†Univ. Hasanuddin.

S. Sosrodarsono, “Alat Alat Berat dan Penggunaannya,†pp. 1–243, 1992, doi: 10.1016/S0031-9422(00)84895-5.

S. F. Rostiyanti, ALAT BERAT UNTUK PROYEK KONSTRUKSI. 2008.

D. D. Supit, “ANALISA PRODUKTIVITAS DAN EFISENSI ALAT BERAT UNTUK PEKERJAAN TANAH, DAN PEKERJAAN PERKERASAN BERBUTIR,†J. Dyn. Saint, 2018.

I. Aoliya, P. Wiranto, and A. Mudianto, “Analisa Produktivitas Alat Berat Pada Pembangunan Jalan Ruas Lingkar Pulau Marsela Provinsi Maluku Barat Daya,†JOM Tek. Sipil, vol. 1, no. 1, 2017.

M. D. Agusti, E. Rita, and I. Khaidir, “Berat Pada Proyek Peningkatan Pembangunan Jalan Penggambiran Rura - Pratotang Kabupaten Pasaman Barat,†pp. 1–18, 2012.

N. Mukhlisani, S. Wigjosoebroto, and I. Sudarso, “Pendekatan Structural Equation Modeling Untuk Analisa Faktor Yang Mempengaruhi Produktivitas Dari Tinjauan Keselamatan, Kesehatan, dan Lingkungan Kerja di PT. Barata Indonesia (Persero)-Gresik,†Pros. Semin. Nas. Manaj. Teknol. VIII, 2008.

A. Gafur, “Analisa perhitungan produktivitas alat berat pada pelaksanaan lahan untuk pembuatan work shop,†Tek. Sipil dan Arsit., vol. 1, no. 1, 2012.

R. M. Sokop, T. T. Arsjad, and G. Malingkas, “Analisa Perhitungan Produktivitas Alat Berat Gali-Muat (Excavator) Dan Alat Angkut (Dump Truck) Pada Pekerjaan Pematangan Lahan Perumahan Residence Jordan Sea,†TEKNO, vol. 16, no. 70, 2018.