Optimalisasi Biaya dan Waktu Proyek Kontruksi Pelebaran Jalan Menggunakan Earned Value
(1) Faculty Of Engineering, Kadiri University
(2) Faculty Of Engineering, Kadiri University
(3) Faculty Of Engineering, Kadiri University
(4) Faculty Of Engineering, Kadiri University
(5) Faculty Of Engineering, Kadiri University
(*) Corresponding Author
Abstract
Keywords
References
B. Damara and R. Hepiyanto, “Optimalisasi Waktu dan Biaya Pada Proyek Gedung Pertanahan Nasional Kota Blitar Dengan Metode Critical Path Method (CPM),” J. Manaj. Teknol. Tek. Sipil, vol. 4, no. 1, pp. 119–133, 2021, doi: 10.1016/j.jksues.2019.09.005.
J. Harmawanto, Y. C. S. Poernomo, and S. Winarto, “Analisa Anggaran Biaya Dan Penjadwalan Proyek Perbaikan Tanggul Kali Bakung Desa Cengkok Kecamatan Tarokan Kabupaten Kediri,” J. Manaj. Teknol. Tek. Sipil, vol. 2, no. 2, pp. 224–235, 2019.
R. Oza Pubawa, A. Ridwan, and Y. Cahyo, “Perencanaan Struktur Atas Asrama Putri Di Universitas Kadiri,” J. Manaj. Teknol. Tek. Sipil, vol. 1, no. 2, pp. 9–18, 2018, doi: 10.30737/jurmateks.v1i2.376.
R. S. Putra, A. Ridwan, S. Winarto, and A. I. Candra, “Study Perencanaan Struktur Atas Gedung Guest House 6 Lantai Di Kota Kediri,” J. Manaj. Teknol. Tek. Sipil, vol. 3, no. 1, p. 35, 2020, doi: 10.30737/jurmateks.v3i1.886.
E. Wahyuni and B. Hendrawan, “Analisis Kinerja Proyek ‘Y’Menggunakan Metode Earned Value MANAGEMENT (Studi Kasus di PT Asian Sealand Engineering),” J. Appl. Bus. Adm., vol. 2, no. 1, pp. 60–78, 2018, doi: 10.30871/jaba.v2i1.784.
E. B. Prasetya, “Aplikasi Manajemen Proyek Konstruksi dengan Metode Critical Path dan Earned Value Management,” Resist. (elektRonika kEndali Telekomun. tenaga List. kOmputeR), vol. 1, no. 2, p. 53, 2018, doi: 10.24853/resistor.1.2.53-68.
W. R. Putra, A. Ridwan, Y. Cahyo, and A. I. Candra, “Studi Pelaksanaan Kinerja Percepatan Waktu Pada Proyek Pembangunan Gedung Bank Darah Rumah Sakit Dr. Soedomo,” J. Manaj. Teknol. Tek. Sipil, vol. 3, no. 1, pp. 76–85, 2020, doi: 10.30737/jurmateks.v3i1.892.
H. Pratikto, “Penelitian Kuat Uji Tekan Beton Dengan Memanfaatkan Limbah Beton Yang Tidak Terpakai,” UKaRsT, vol. 1, no. 2, p. 21, 2017, doi: 10.30737/ukarst.v1i2.411.
M. Geumala, R. Supriharjo, P. G. Ariastita, and M. Ali, “Konsep Pengembangan Kota Baru Di Sukodono Sidoarjo,” U KaRsT, vol. 2, no. 1, pp. 77–87, 2018.
B. Zakariyya, A. Ridwan, and Suwarno, “Analisis Biaya Dan Jadwal Proyek Pembangunan Gedung Dinas Kesehatan Kabupaten Trenggalek Dengan Metode Earned Value,” J. Manaj. Teknol. Tek. Sipil, vol. 3, no. 2, pp. 362–376, 2020, doi:
1016/j.omega.2005.10.004.Analisis.
E. Siswanto and A. Gunarto, “Penambahan Fly Ash Dan Serat Serabut Kelapa Sebagai Bahan Pembuatan Beton,” UKaRsT, vol. 3, no. 1, pp. 56–65, 2019.
H. R. Agustapraja and D. Kartikasari, “Studi Evaluasi Pekerjaan Struktur Box Culvert Pada Proyek Pembangunan Jembatan Kucing Ruas Sukodadi – Sumberwudi Kabupaten Lamongan,” UKaRsT, vol. 1, no. 1, pp. 50–59, 2017.
B. Damara, “Cost Performance Analysis And Time Development Construction Project Bridge Chain Karanggeneng Nawacita Cs Using The Earned Value Method,” UKaRsT, vol. 4, no. 2, pp. 177–191, 2020.
A. Badewi, “The impact of project management (PM) and benefits management (BM) practices on project success: Towards developing a project benefits governance framework,” Int. J. Proj. Manag., vol. 34, no. 4, pp. 761–778, 2016, doi: 10.1016/j.ijproman.2015.05.005.
R. Joslin and R. Müller, “Relationships between a project management methodology and project success in different project governance contexts,” Proj. Manag. Methodol. Gov. Success. Auerbach Publ., vol. 33, no. 6, 2019, doi: 10.1016/j.ijproman.2015.03.005.
H. A. Hornstein, “The integration of project management and organizational change management is now a necessity ☆,” Int. J. Proj. Manag., vol. 33, no. 2, pp. 291–298, 2015, doi: 10.1016/j.ijproman.2014.08.005.
B. Kim and M. Asce, “Dynamic Control Thresholds for Consistent Earned Value Analysis and Reliable Early Warning,” J. Manag. Eng., vol. 31, no. 5, 2015, doi: 10.1061/(ASCE)ME.1943-5479.0000309.
G. Urrea, S. Villa, and P. Gonçalves, “Exploratory analyses of relief and development operations using social networks,” Socioecon. Plann. Sci., vol. 56, pp. 27–39, 2016, doi: 10.1016/j.seps.2016.05.001.
T. Narbaev, D. Ph, A. De Marco, and D. Ph, “Combination of Growth Model and Earned Schedule to Forecast Project Cost at Completion,” J. Constr. Eng. Manag., vol. 140, no. 1, 2014, doi: 10.1061/(ASCE)CO.1943-7862.0000783.
K. C. Wang, W. C. Wang, H. H. Wang, P. Y. Hsu, W. H. Wu, and C. J. Kung, “Applying building information modeling to integrate schedule and cost for establishing construction progress curves,” Autom. Constr., vol. 72, pp. 397–410, 2016, doi: 10.1016/j.autcon.2016.10.005.
J. Batselier and M. Vanhoucke, “Empirical Evaluation of Earned Value Management Forecasting Accuracy for Time and Cost,” J. Constr. Eng. Manag., vol. 141, no. 11, pp. 1–13, 2015, doi: 10.1061/(ASCE)CO.1943-7862.0001008.
F. S. Demachkieh and A. M. Asce, “Administration of Construction Contract Interim Payments Based on Earned-Value Reduction Techniques,” J. Leg. Aff. Disput. Resolut. Eng. Constr., vol. 11, no. 4, 2019, doi: 10.1061/(ASCE)LA.1943-4170.0000309.
M. Picornell, E. Pellicer, M. Asce, C. Torres-machí, and M. Sutrisna, “Implementation of Earned Value Management in Unit-Price Payment Contracts,” J. Manag. Eng., vol. 33, no. 3, 2017, doi: 10.1061/(ASCE)ME.1943-5479.0000500.
Babar, Suqrat, M. J. Thaheem, and B. Ayub, “Estimated Cost at Completion : Integrating Risk into Earned Value Management,” J. Constr. Eng. Manag., vol. 143, no. 3, 2017, doi: 10.1061/(ASCE)CO.1943-7862.0001245.
O. P. Sanchez, M. A. Terlizzi, H. Roberto, and D. O. Cesar, “Cost and time project management success factors for informa- tion systems development projects,” Int. J. Proj. Manag., vol. 35, no. 8, pp. 1608–1626, 2017, doi: 10.1016/j.ijproman.2017.09.007.
DOI: http://dx.doi.org/10.30737/jurmateks.v4i2.1828
Article Metrics
Abstract view : 13786 timesPDF - 351 times Similarity - 80 times
Refbacks
- There are currently no refbacks.
Email : jurmateks@unik-kediri.ac.id
Jurnal Manajemen Teknologi dan Teknik Sipil (JURMATEKS) is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.