STUDI PERENCANAAN TEBAL PERKERASAN KONSTRUKSI JALAN RAYA (MENGGUNAKAN METODE BINA MARGA) PADA RUAS JALAN UMASUKAER DI KABUPATEN MALAKA

Authors

  • Philipus Resato Nahak Fakultas Teknik Universitas Kadiri
  • Yosef Cahyo Fakultas Teknik Universitas Kadiri
  • Sigit Winarto Fakultas Teknik Universitas Kadiri

DOI:

https://doi.org/10.30737/jurmateks.v2i1.393

Keywords:

Pavement Thickness, Highway, Bina Marga, Traffic

Abstract

The increase in traffic volume will cause a decrease in service due to decreased road capacity due to an increase in side constraints and due to the increase in traffic volume itself, which will ultimately cause the level of road saturation to increase. The situation occurred in the Umasukaer road section of the Malacca Regency. Therefore it is necessary to address improvements in the quality of the road in order to meet the feasibility of transportation facilities by taking into account the existing technical requirements. The results of planning found that through the 2015 LHR survey data with a prediction of an increase in traffic density of 6% per year, the LHR was obtained with a planned age of 7 years = 2540.7 vehicles/day/department and a 20-year plan life LHR = 5419.1 ked/day / major. The results of a gradual construction planning pavement study can be concluded that the planning model that has been designed is effective in strengthening road construction in accordance with existing technical requirements and efficient in terms of financing. The final results of gradual construction pavement thickness results are: Ashburton thickness (MS 744) = 8 cm, Ashburton (MS 744) = 13 cm, broken stone (CBR 100) = 20 cm, Sirtu (CBR 50) = 10 cm and CBR subgrade 5%.

 

Pertambahan volume lalu lintas akan menyebabkan penurunan layanan diakibatkan menurunnya kapasitas jalan karena adanya peningkatan hambatan samping maupun karena beratambahnya volume lalu lintas itu sendiri yang pada akhirnya akan meyebabkan tingkat kejenuhan jalan meningkat. Keadaan tersebut terjadi ruas jalan Umasukaer Kabupaten Malaka, oleh karena itu perlu adanya penanganan perbaikan kualitas jalan agar memenuhi segi kelayakan sarana transportasi dengan memperhatikan syarat-syarat teknik yang ada. Hasil perencanaan didapatkan bahwa melalui data survey LHR tahun 2015 dengan prediksi peningkatan kepadatan lalu lintas sebesar 6% pertahun maka didapatkan LHR dengan umur rencana 7 tahun = 2540,7 kend/hr/jurusan dan LHR umur rencana 20 tahun = 5419,1 ked/hr/jurusan. Hasil studi perencanaan perkerasan konstruksi bertahap dapat diambil kesimpulan bahwa model perencaaan yang telah dirancang efektif dalam memperkerasa konstruksi jalan sesuai dengan syarat teknis yang ada serta efisien dalam hal pembiayaan. Hasil akhir tebal perkerasan konstruksi bertahap diperoleh hasil: Ketebalan Asbuton (MS 744) = 8 cm, Asbuton (MS 744) = 13 cm, batu pecah (CBR 100) = 20 cm, Sirtu (CBR 50) = 10 cm dan CBR tanah dasar 5%.

References

Departemen Pekerjaan Umum, “Petunjuk Perencanaan Tebal Perkerasan Lentur Jalan Raya Dengan Metode Analisa Komponen,†1987.

A. Kholiq, “Perencanaan Tebal Perkerasan Lentur Jalan Raya Antara Bina Marga Dan Aashto’93 (Studi Kasus: Jalan Lingkar Utara Panyingkiran-Baribis Ajalengka),†J-Ensitec, vol. 1, no. 01, pp. 43–51, 2014, doi: 10.31949/j-ensitec.v1i01.15.

O. Nurahmi and A. A. G. Kartika, “Perbandingan Konstruksi Perkerasan Lentur dan Perkerasan Kaku serta Analisis Ekonominya pada Proyek Pembangunan Jalan Lingkar Mojoagung,†J. Tek. ITS, vol. 1, no. 1, pp. 63–68, 2012.

E. Nurfadzilah, S. Winarto, and Y. C. SP, “ANALISA JALAN RING ROAD NGAWI STA 3+200 – STA 6+200 KABUPATEN NGAWI PROPINSI JAWA TIMUR,†Jurmateks, vol. 1, no. 1, pp. 33–43, 2018.

A. Wignall, “Proyek Jalan Teori dan Praktek,†2000.

A. I. Candra, S. Anam, Z. B. Mahardana, and A. D. Cahyono, “STUDI KASUS STABILITAS STRUKTUR TANAH LEMPUNG PADA JALAN TOTOK KEROT KEDIRI MENGGUNAKAN LIMBAH KERTAS,†Ukarst J. Univ. Kadiri Ris. Tek. Sipil, vol. 2, no. 2, pp. 88–97, 2018.

B. A. Harsono, S. Winarto, and Y. C. S, “PERENCANAAN PENINGKATAN JALAN PADA RUAS JALAN PACITAN-NGADIROJO,†Jurmateks, vol. 1, no. 2, pp. 291–302, 2018.

E. Gardjito, “STUDY PERENCANAAN GEOMETRIK, PERKERASAN JALAN DAN PERENCANAAN ANGGARAN BIAYA PADA JALAN RAYA KALIDAWIR – Ds. NGUBALAN Kec. KALIDAWIR,†UKaRsT, vol. 1, no. 2, pp. 94–101, 2017, doi: 10.30737/ukarst.v1i2.264.

A. I. Candra, A. Yusuf, and A. R. F, “Studi Analisis Daya Dukung Pondasi Tiang Pada Pembangunan Gedung Lp3M Universitas Kadiri,†J. CIVILA, vol. 3, no. 2, p. 166, 2018, doi: 10.30736/cvl.v3i2.259.

C. Yulianto, Y. Cahyo, A. Ridwan, and A. I. Candra, “PENELITIAN PENAMBAHAN BAHAN ADITIF KAPUR PADAM SEBAGAI BAHAN PENGISI FILLER PADA CAMPURAN ASPAL BETON,†Jurmateks, vol. 1, no. 2, pp. 204–215, 2018.

N. A. Affandi and R. Hepiyanto, “Studi Evaluasi Tebal Perkerasan Kaku Pada Ruas Jalan Dradah – Kedungpring Mengunakan Metode Bina Marga 2002,†UKaRsT, vol. 2, no. 2, p. 7, 2018, doi: 10.30737/ukarst.v2i2.265.

R. Yuwono, Y. C. Sp, and L. D. K, “STUDY ANALISA VOLUME KENDARAAN PADA SIMPANG BERSINYAL DI PEREMPATAN ALUN ALUN KOTA KEDIRI,†Jurmateks, vol. 1, no. 1, pp. 101–111, 2018.

S. Sukirman, Perkerasan lentur jalan raya, vol. 2. 1999.

I. T. Husodo and S. Budirahardjo, “Analisa desain pelebaran perkerasan lentur pada jalan wolter monginsidi semarang,†J. Tek. Sipil Giratory Upgris, vol. 1, no. 1, pp. 1–9, 2019.

H. . H. Hasmar, Drainasi Terapan. Yogyakarta : UII Press, 2011, 2011.

Dinas Pekerjaan Umum dan Penataan Ruang, “Analisa Harga Satuan,†Kediri, 2018.

Departemen Permukiman dan Prasarana Wilayah, “Pd T-14-2003 Perencanaan Perkerasan Jalan Beton Semen.†.

Direktorat Jendral Bina Marga, “Perencanaan Geometrik Jalan,†Departemen Pekerjaan Umum. 2017.

[Kementerian PUPR]. Kementerian Pekerjaan Umum dan Perumahan Rakyat, “Perencanaan Perkerasan Jalan Beton Semen,†p. 52, 2003.

Badan Standardisasi Nasional, “SNI 03-2406-1991 Tata Cara Perencanaan Umum Drainase Perkotaan,†1991.

Badan Standardisasi Nasional, “SNI 03-3424-1994 Tata Cara Perencanaan Drainase Permukaan Jalan,†1994.

Badan Standardisasi Nasional, “SNI 03-1724-1989 Pedoman Perencaanaan Hidrologi dan Hidraulik untuk Bangunan di Sungai,†pp. 1–38, 1989.

Downloads

PlumX Metrics

Published

2019-05-25

Issue

Section

Articles