PERENCANAAN PONDASI TIANG PANCANG PADA GEDUNG SEKRETARIAT DEWAN DPRD KABUPATEN KEDIRI

Authors

  • Dwi Hartanto Fakultas Teknik Universitas Kadiri
  • Yosef Cahyo S Fakultas Teknik Universitas Kadiri
  • Sigit Winarto Fakultas Teknik Universitas Kadiri
  • Agata Iwan Candra Fakultas Teknik Universitas Kadiri http://orcid.org/0000-0002-7657-6810

DOI:

https://doi.org/10.30737/jurmateks.v1i2.418

Keywords:

Pile, Pile Cap, CPT, Bearing Capacity

Abstract

The foundation plays a very important role in the construction of a building. In addition as a foundation for the strength of a building construction, the foundation has the role of distributing the burden of the building on it, so that it can be channeled to the soil underneath it well and make the building able to stand firmly. The purpose of this study is to plan the carrying capacity and size and staking of the Kediri DPRD Council Secretariat Building with sondir data. The author uses the method of direct inspection in the field and coordinates with the Planning Consultant and seeks references from several literatures. From the calculation results obtained the total load of life and death on each floor is 684558.8 Kg, 701838.8 Kg, 736398.8 Kg, 736398.8 Kg, total loading (Wt) obtained 2806395.4 Kg, Dimension of pile foundation = 40 cm; depth = 10 meters, with the number of two pieces per Pile Cap, the need for reinforcement on the building foundation is 20575.05 Kg.

Pondasi memegang peran yang sangat penting pada konstruksi suatu bangunan.Selain sebagai pijakan kekuatan berdirinya suatu konstruksi bangunan, pondasi berperan mendistribusikan beban bangunan diatasnya, sehingga bisa disalurkan ke lapisan tanah dibawahnya dengan baik dan membuat bangunan mampu berdiri dengan kokoh. Tujuan dari studi ini adalah untuk merencanakan daya dukung serta ukuran dan penulangantiang pancang pada Gedung Sekretariat Dewan DPRD Kabupaten Kediri dengan data sondir. Penulis melakukan metode pemeriksaaan langsung dilapangan serta berkoordinasi dengan pihak Konsultan Perencana dan mencari referensi dari beberapa literatur. Dari hasil perhitungan didapatkan hasil total beban hidup dan mati pada setiap lantai adalah 684558,8 Kg, 701838,8 Kg, 736398,8 Kg, 736398,8 Kg, total Pembebanan (Wt) diperoleh 2806395,4 Kg, Dimensi pondasi tiang pancang = 40 cm ; kedalaman = 10 meter, dengan jumlah dua buah per Pile Cap, kebutuhan tulangan pada pondasi gedung adalah 20575.05 Kg.

References

A. S. N. SAPUTRA, G. WIRATAMA, and I. MUHAMMAD, “PERENCANAAN GEDUNG D KAMPUS IV UNIVERSITAS MUHAMMADIYAH BENGKULU.†POLITEKNIK NEGERI SRIWIJAYA, 2016.

D. A. Andhira, “PERENCANAAN PERHITUNGAN PLAT LANTAI, BALOK DAN KOLOM PADA GEDUNG BERLANTAI III.†undip, 2017.

B. S. Nasional, “Tata cara perencanaan ketahanan gempa untuk struktur bangunan gedung dan non gedung,†Sni, vol. 1726, p. 2012, 2012.

A. I. Candra, “Pada Pembangunan Gedung Mini Hospital Universitas Kadiri,†Ukarst, vol. 1, no. 1, pp. 63–70, 2017.

A. Pamungkas and E. Harianti, “Desain Pondasi Tahan Gempa Sesuai SNI03-1726-2002 dan SNI 03-2847-2002,†2002.

I. I. M. Sudarma, I. B. Indramanik, and A. . P. A. Putra, “ANALISA PERBANDINGAN PERENCANAAN STRUKTUR ANTARA PONDASI BORE PILE DENGAN PONDASI TIANG PANCANG (STUDI KASUS PADA PROYEK GEDUNG DPRD BALI),†pp. 15–30, 2015.

S. – 1726- 2002, “STANDAR PERENCANAAN KETAHANAN GEMPA UNTUK STRUKTUR BANGUNAN GEDUNG,†vol. 7798393, no. April, 2002.

F. Febriantoro, Y. C. S. Purnomo, and A. Ridwan, “Study Perencanaan Pondasi Tiang Pancang Jembatan Sembayat Baru II Kecamatan Manyar Kabupaten Gresik,†J. Manaj. Teknol. Tek. Sipil, vol. 1, no. 1, pp. 148–159, 2018, doi: 10.30737/jurmateks.v1i1.147.

A. I. Candra, A. Yusuf, and A. R. F, “Studi Analisis Daya Dukung Pondasi Tiang Pada Pembangunan Gedung Lp3m Universitas Kadiri,†CIVILLa, vol. 3, no. 2, pp. 166–171, 2018.

direktorat penyelidikan masalah Bangunan, “peraturan-pembebanan-indonesia-1983.pdf.†.

H. C. Hardiyatmo, “Analisa dan Perancangan Fondasi bagian 1.†Gadjah Mada University Press, Jogjakarta, 2010.

P. Anugrah and H. Erny, “Desain Pondasi Tahan Gempa Sesuai SNI 03-1726-2002 dan SNI 03-2847-2002,†Andi, Yogyakarta, 2013.

D. P. Umum, “Standar Tata Cara Perhitungan Struktur Beton untuk Bangunan Gedung,†SK SNI T–15–1991–03, Yayasan LPBM, Bandung, 1991.

A. A. P. A. Putra, I. B. G. Indramanik, and I. M. Sudarma, “ANALISA PERBANDINGAN PERENCANAAN STRUKTUR ANTARA PONDASI BORE PILE DENGAN PONDASI TIANG PANCANG,†J. Tek. Gradien, vol. 8, no. 2, pp. 15–30, 2016.

A. Aminudin and N. Z. Devi, “ANALISIS DAYA DUKUNG PONDASI BORED PILE PADA PROYEK PEMBANGUNAN JALAN TOL BAWEN-SALATIGA PAKET 3.1.†Fakultas Teknik UNISSULA, 2016.

F. Haliq, “Islam Madura: Studi Konflik, Adaptasi, Harmoni Kelas Menengah Madura Setelah Keruntuhan Orde Baru,†2010.

E. Bowles Joseph, “Analisa dan Desain Pondasi jilid 1,†Penerbit Erlangga, Jakarta.(23 Februari 2019), 1986.

A. Soenaryo, M. T. Hidayat, and H. Siswanto, “Perbaikan Kolom Beton Bertulang Menggunakan Concrete Jacketing dengan Prosentase Beban Runtuh yang Bervariasi,†Rekayasa Sipil, vol. 3, no. 2, pp. 91–100, 2012.

C.-K. Wang, B. Hariandja, and C. G. Salmon, Desain beton bertulang. Erlangga, Jakarta, 1987.

W. Hadi Pratomo, “Struktur Beton Prategang (Teori dan Prinsip Desain),†Nova, 1994.

M. B. Hanafi, “Perencanaan Struktur Apartemen 5 Lantai+ 1 Basement Dengan Sistem Rangka Pemikul Momen Menengah (SRPMM) Di Sukoharjo.†Universitas Muhammadiyah Surakarta, 2015.

Downloads

PlumX Metrics

Published

2018-08-29

Issue

Section

Articles