|
Issue |
Title |
|
Vol 3, No 2 (2021): August |
Perbaikan Kualitas Pada Proses Produksi Kabel Type NYA dengan Metode Quality Control Circle (QCC) Pada Perusahaan Manufaktur Kabel di Banyumas |
Abstract
pdf
|
Aulia Annai Nashida, Yudi Syahrullah |
|
Vol 3, No 1 (2021): January |
Perencanaan Predictive Dan Preventive Maintenance Pada Pompa SWLP (Sea Water Lift Pump) Dengan Menggunakan Metode RCM (Reliability Centered Maintenance) Di Saka Indonesia Pangkah Limited |
Abstract
PDF
|
Samsul Huda, Afiff Yudha Tripariyanto, Ana Komari |
|
Vol 2, No 1 (2020): January |
Analisis Rejected Produk Dalam Proses Return Di PT. Gunawan Fajar Menggunakan Metode FMEA |
Abstract
PDF
|
Dyan Putra Pradana, Sri Rahayuningsih, Heribertus Budi Santoso |
|
1 - 3 of 3 Items |
|