(1)
Optimalisasi Waktu Dan Biaya Pada Proyek Gedung Pertanahan Nasional Kota Blitar Dengan Metode Critical Path Method (CPM). JURMATEKS 2021, 4 (1), 119-133. https://doi.org/10.30737/jurmateks.v4i1.1735.