(1)
Perencanaan Predictive Dan Preventive Maintenance Pada Pompa SWLP (Sea Water Lift Pump) Dengan Menggunakan Metode RCM (Reliability Centered Maintenance) Di Saka Indonesia Pangkah Limited. JURMATIS 2021, 3 (1), 37-51. https://doi.org/10.30737/jurmatis.v3i1.1406.