(1)
Analisa Optimalisasi Waktu Kerja Karyawan Dengan Menggunakan Metode Hungarian (Studi Kasus Bengkel Jaya Battery Motor). JURMATIS 2021, 3 (2), 92-102. https://doi.org/10.30737/jurmatis.v3i2.1708.