(1)
PERANCANGAN PENJADWALAN PERAWATAN MESIN BUBUT DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) DI BENGKEL PEMESINAN SMK NEGERI 1 KEDIRI. JURMATIS 2019, 1 (1), 13-23. https://doi.org/10.30737/jurmatis.v1i1.291.