[1]
Damara, B. 2020. COST PERFORMANCE ANALYSIS AND TIME DEVELOPMENT CONSTRUCTION PROJECT BRIDGE CHAIN KARANGGENENG NAWACITA CS USING THE EARNED VALUE METHOD. UKaRsT. 4, 2 (Oct. 2020), 177–191. DOI:https://doi.org/10.30737/ukarst.v4i2.1067.