COST PERFORMANCE ANALYSIS AND TIME DEVELOPMENT CONSTRUCTION PROJECT BRIDGE CHAIN KARANGGENENG NAWACITA CS USING THE EARNED VALUE METHOD. (2020). UKaRsT, 4(2), 177-191. https://doi.org/10.30737/ukarst.v4i2.1067