PENGENDALIAN JADWAL DAN ANGGARAN TERPADU DENGAN METODE EARNED VALUE ANALYSIS PADA PEKERJAAN KONSTRUKSI. (2018). UKaRsT, 1(1), 19-26. https://doi.org/10.30737/ukarst.v1i1.82