Gardjito, E. (2018). PENGENDALIAN JADWAL DAN ANGGARAN TERPADU DENGAN METODE EARNED VALUE ANALYSIS PADA PEKERJAAN KONSTRUKSI.
UKaRsT
,
1
(1), 19–26. https://doi.org/10.30737/ukarst.v1i1.82