Damara, B. (2020). COST PERFORMANCE ANALYSIS AND TIME DEVELOPMENT CONSTRUCTION PROJECT BRIDGE CHAIN KARANGGENENG NAWACITA CS USING THE EARNED VALUE METHOD.
UKaRsT
,
4
(2), 177–191. https://doi.org/10.30737/ukarst.v4i2.1067