“COST PERFORMANCE ANALYSIS AND TIME DEVELOPMENT CONSTRUCTION PROJECT BRIDGE CHAIN KARANGGENENG NAWACITA CS USING THE EARNED VALUE METHOD” (2020) UKaRsT, 4(2), pp. 177–191. doi:10.30737/ukarst.v4i2.1067.