Damara, B. (2020) “COST PERFORMANCE ANALYSIS AND TIME DEVELOPMENT CONSTRUCTION PROJECT BRIDGE CHAIN KARANGGENENG NAWACITA CS USING THE EARNED VALUE METHOD”, UKaRsT, 4(2), pp. 177–191. doi: 10.30737/ukarst.v4i2.1067.