[1]
“Repair Performance Landslide and Slope Using Bore pile and Ground Anchor on Cipali Toll Road Km 103”, U Karst, vol. 5, no. 2, pp. 236–251, Dec. 2021, doi: 10.30737/ukarst.v5i2.1583.