“Determining the Type Of Skybridge From The Bojonggede Station to The Bojonggede Terminal Considering The Traffic Impact”. UKaRsT, vol. 6, no. 1, Apr. 2022, pp. 43-56, https://doi.org/10.30737/ukarst.v6i1.2386.