PENELITIAN CAMPURAN ASPAL BETON DENGAN MENGGUNAKAN FILLER BUNGA PINUS

April Gunarto(1*),

(1) Kadiri University
(*) Corresponding Author

Abstract


Abstract

This study aims to determine the mixture of Pine Flowers using the Marshall method, and to determine the optimum asphalt content produced in concrete asphalt mixture with Pine Flower fillers, reviewed from the Marshall reserves, flow, VIM (voids In Mix), VMA (Void In Mineral ) Aggregate), VFB (Void Filled Bitumen), and Marshall quotient (MQ).

The concrete asphalt mixture method in this study used AC 60/70 oil asphalt. This study consisted of 5 samples, each using different asphalt levels, namely: 5%, 5.5%, 6%, 6.5%, 7%. With each sample consisting of 3 variants of sample specimens. This research was conducted at the Technical Laboratory, the university attended. The stages of the study included coarse aggregate of the solid rock held by filter no. 8 (2.36mm), fine aggregate with brantas river sand passes the no. 8 (2.36mm), and fillers use pine ashes by passing filter no. 200 (0.075mm).

The results of this study about Marshall characteristics obtained Optimal Asphalt levels of 6.5% with a mean Stability value of 1417, a mean Flow value of 3.6 mm, a mean value of VIM (voids In Mix) 4.11%, a mean value of VMA (Void In Mineral Aggregate 16.69%, VFB (Void Filled Bitumen) mean value 73.57%, and Marshall quotient (MQ) mean value 314 kg / mm.

 

Keywords: Concrete Asphalt, Marshall Method, Pine Flowers


Full Text:

PDF

References


DAFTAR PUSTAKA

AASHTO. 1990. Standard Specifications For Transportation Materials And Methods of Sampling and Testing. Part I. "Specifications". Fifteenth Edition. Washington,D.C

AASHTO. 1990. Standard Specifications For Transportation Materials And Methods of Sampling and Testing. Part II. "Tests". Fifteenth Edition. Washington,D.C.

ASTM D 1559-76 atau AASHTO T-245-90, Rancangan Campuran Berdasarkan Metode Marshall.

Departemen Pekerjaan Umum. 1987. Petunjuk Pelaksanaan Lapis Aspal Beton (Laston) Untuk Jalan Raya.

Departemen Pekerjaan Umum. 1999. Pedoman Perencanaan Campuran Beraspal Panas Dengan Pendekatan Kepadatan Mutlak Jakarta: PT. Mediatama Saptakarya (PT. Medisa).

Direktorat Jenderal Bina Marga Departemen Pekerjaan Umum Republik Indonesia. 2010. Spesifikasi Umum Divisi 6 hal 38

Direktorat Jenderal Bina Marga Departemen Pekerjaan Umum Republik Indonesia. 2010. Spesifikasi Umum Divisi 6 Perkerasan Aspal

Purwadi, Didik. 2009. Pedoman Penulisan Laporan Kerja Praktik. Semarang: Program Diploma III Jurusan Teknik Sipil, Fakultas Teknik, Universitas Diponegoro.

Rancangan Spesifikasi Umum Bidang Jalan dan Jembatan, Divisi VI Perkerasan Beraspal, Dep. PU, Edisi April 2007

SNI 06-2489-1991. Prosedur Pengujian dengan Metode Marshall




DOI: http://dx.doi.org/10.30737/ukarst.v3i1.351

Article Metrics

Abstract view : 65 times
PDF - 62 times

Refbacks

  • There are currently no refbacks.


EMAIL : ukarst@unik-kediri.ac.id

INDEXED BY:

 Flag Counter

Lisensi Creative Commons
Journal UKaRsT is licensed under a Creative Commons Attribution 4.0 International License.