Penerapan Lean Manufacturing Untuk Meminimasi Waste Delay Pada Workstation Curing di PT Bridgestone Tire Indonesia

Authors

  • Yulinda Uswatun Kasanah Jurusan Teknik Industri, Fakultas Rekayasa Industri, Universitas Telkom
  • Pratya Poeri Suryadhini Jurusan Teknik Industri, Fakultas Rekayasa Industri, Universitas Telkom
  • Murni Astuti Jurusan Teknik Industri, Fakultas Rekayasa Industri, Universitas Telkom

DOI:

https://doi.org/10.30737/jatiunik.v2i1.273

Keywords:

Lean Manufacture, SMED, Setup time, Workstation Curing

Abstract

Lean Manufacturing is a method used to increased productivity and costs reduction by minimizing waste in the production process. This study describe the use of lean manufacturing with Single Minutes Exchange Of Dies tools on the PSR’s production floor in PT XYZ, which is engaged in automotive manufacture form making of car tires. Research stage begins by analyzing waste using mapping tool and identification causes of waste in workstation curing. The next stage is analyzing every step of machine setup that occurs are workpiece setup, mold setup, curing setup, and finishing setup. Based on observations, the amount of the initial state setup time is 194,05 minutes. The improvement begin by convert internal activities setup into external setup, reduction of operator displacement activity, elimination of adjusment, and apply a parallel operation by using two operators. So the total setup time can be reduced is equal to 127,41 minutes.

 

Lean Manufacturing merupakan metode yang digunakan untuk meningkatkkan produktivitas dan pengurangan biaya dengan cara meminimasi pemborosan dalam proses produksi. Penelitian ini menjelaskan penggunaan Lean Manufacturing dengan tool Single Minutes Exchange Of Dies (SMED) pada lantai produksi PSR di PT XYZ, yang bergerak dalam bidang Automotive Manufacture berupa pembuatan ban mobil. Tahap penelitian diawali dengan melakukan analisis waste dengan Mapping tools dilanjutkan dengan mengidentifikasi penyebab pemborosan pada workstation curing. Tahap Selanjutnya adalah menganalisis tahapan proses setup mesin curing yang terdiri dari setup benda kerja, setup mold, setup curing, dan setup finishing. Berdasarkan hasil pengamatan, jumlah waktu setup keadaan awal adalah 194,05 menit. Perbaikan yang dilakukan adalah dengan mengkonversi aktivitas internal setup menjadi eksternal setup, pengurangan aktivitas perpindahan operator, eliminasi adjusment, dan menerapkan operasi paralel yaitu dengan menggunakan 2 operator. Sehingga total waktu setup yang dapat direduksi adalah 127,41 menit.



References

J. Wakiru, L. Pintelon, P. N. Muchiri, and P. Chemweno, “Maintenance Optimization: Application of Remanufacturing and Repair Strategies,†Procedia CIRP, vol. 69, no. May, pp. 899–904, 2018.

M. M. Firmansyah, A. Susanty, and D. Puspitasari, “Analisis Overall Equipment Effectiveness dan Six Big Losses pada Mesin Pencelupan Benang (Studi Kasus PT. Pismatex Textile Industry),†Ind. Eng. Online J., vol. 4, no. 4, 2015.

P. Shetty and B. {Prakash Rao}, “Importance of lean concepts and its need in construction projects,†Int. J. Recent Technol. Eng., vol. 8, pp. 2534–2541, 2019.

A. K. Möldner, J. A. Garza-Reyes, and V. Kumar, “Exploring lean manufacturing practices’ influence on process innovation performance,†J. Bus. Res., vol. 106, no. May 2018, pp. 233–249, 2020.

P. Arunagiri and A. Gnanavelbabu, “Identification of major lean production waste in automobile industries using weighted average method,†Procedia Eng., vol. 97, pp. 2167–2175, 2014.

A. Azizi and T. a/p Manoharan, “Designing a Future Value Stream Mapping to Reduce Lead Time Using SMED-A Case Study,†Procedia Manuf., vol. 2, no. February, pp. 153–158, 2015.

K. Salonitis and C. Tsinopoulos, “Drivers and Barriers of Lean Implementation in the Greek Manufacturing Sector,†Procedia CIRP, vol. 57, pp. 189–194, 2016.

T. Widodo and I. Ferdiansyah, “Implementasi Lean Dengan Menggunakan Value Stream Mapping Untuk Mempercepat Lead Time Proses Outbound Di Pt . X,†vol. 2, no. 2, pp. 85–91, 2017.

W. Adrianto and M. Kholil, “Analisis Penerapan Lean Production Process untuk Mengurangi Lead Time Process Perawatan Engine (Studi Kasus PT.GMF AEROASIA),†J. Optimasi Sist. Ind., vol. 14, no. 2, p. 299, 2016.

R. Prasetyo Lukodono and R. Soenoko, “Analisis Penerapan Metode RCM Dan MVSM Untuk Meningkatkan Keandalan Pada Sistem Maintenance (Studi Kasus PG. X) Mahasiswa Jurusan Teknik Mesin Program Magister Fakultas Teknik UB,†J. Rekayasa Mesin, 2013.

M. K. Wyrwicka and B. Mrugalska, “Mirages of Lean Manufacturing in Practice,†Procedia Eng., vol. 182, pp. 780–785, 2017.

E. A. P. H. Putra and Z. F. Ikatrianasari, “Penerapan Lean Manufacturing melalui Metode Gemba Kaizen dengan Pendekatan Siklus PDCA untuk Peningkatan Produktivitas di PT. XYZ, Bekasi,†Magister Tek. Ind., vol. ISBN : 978, pp. 978–979, 2012.

D. T. Matt and E. Rauch, “Implementation of lean production in small sized enterprises,†Procedia CIRP, vol. 12, pp. 420–425, 2013.

R. N. Yusfi and T. P. Damanhur, “Study Of Solid Waste Characteristics And Recycle Potential In Cikapundung Riverbanks,†J. Tek. Lingkung., vol. 18, no. 2, pp. 155–166, 2012.

M. Rossini, F. Costa, A. P. Staudacher, and G. Tortorella, “Industry 4.0 and lean production: An empirical study,†IFAC-PapersOnLine, vol. 52, no. 13, pp. 42–47, 2019.

R. Sundar, A. N. Balaji, and R. M. Satheesh Kumar, “A review on lean manufacturing implementation techniques,†Procedia Eng., vol. 97, pp. 1875–1885, 2014.

D. Triagus Setiyawan, S. Soeparman, and R. Soenoko, “Minimasi Waste Untuk Perbaikan Proses Produksi Kantong Kemasan Dengan Pendekatan Lean Manufacturing,†J. Eng. Manag. Industial Syst., vol. 1, no. 1, pp. 8–13, 2013.

R. Hutagaol, “Analysis of the Implementation of Nursing Professional Values in Referral Hospitals Jakarta: Fishbone Analysis,†Int. J. Nurs. Heal. Serv., vol. 2, no. 1, pp. 108–116, 2019.

Nasir, “FISHBONE STRATEGY IN TEACHING ENGLISH IN INDONESIA: A TOOL,†J. Chem. Inf. Model., vol. 53, no. 9, pp. 1689–1699, 2019.

H. P. Bloch, “Root Cause Failure Analysis,†in Petrochemical Machinery Insights, 2017.

Downloads

PlumX Metrics

Published

2019-03-03

How to Cite

Kasanah, Y. U., Suryadhini, P. P., & Astuti, M. (2019). Penerapan Lean Manufacturing Untuk Meminimasi Waste Delay Pada Workstation Curing di PT Bridgestone Tire Indonesia. JATI UNIK : Jurnal Ilmiah Teknik Dan Manajemen Industri, 2(1), 14–23. https://doi.org/10.30737/jatiunik.v2i1.273

Issue

Section

Articles