PERENCANAAN PONDASI BORE PILE PADA PROYEK JEMBATAN NGUJANG II KAB.TULUNGAGUNG
DOI:
https://doi.org/10.30737/ukarst.v2i1.356Abstract
The method used in analyzing the foundation of this research is the Mayerhof method and the RSNI-T-02-2015 based approach to standard loading for bridges, thus obtaining a total vertical load of 770,121 tons, using a bore foundation 80 cm in diameter with the mayerhof method number of poles 15 with a distance of 2 meters, so the bearing capacity of the foundation pile group: Qug 852,1889 tons> from the load carried (Pu) 770,121 tons (okay), one-way control conditions φVc shear force, 6754,405> Vu, shear strength concrete, 369,490 (okay), two-way control conditions, cVc shear force, 9885.9 tons> Vc concrete shear strength 5088,825 tons (okay), reinforcement bore pile foundation. Vc. Shear force 48,593 <Φ * Vc concrete shear resistance 60,625 (okay) the number of staple reinforcement needed 21 d19 and stirrup reinforcement d13, according to the calculation, 15 bore piles are able to withstand the burdens of the upper bridge structure.
Â
Keywords: bore pile foundation of the mayerhof method
Â
Â
Metode yang di pergunakan  dalam  melakukan analisa  pada  pondasi pada  penelitian  ini adalah  metode Mayerhof dan  pendekatan  berdasarkan  RSNI-T-02-2015 tentang  standar pembebanan untuk jembatan ,maka didapat total beban vertikal 770,121 ton, menggunakan pondasi bore diameter 80 cm dengan metode mayerhof jumlah tiang 15 dengan jarak 2 meter, jadi daya dukung tanah pondasi tiang kelompok: Qug 852,1889 ton > dari beban yang di pikul (Pu )770,121 ton(oke),control satu arah  syarat  φVc gaya geser, 6754,405 >  Vu,kuat geser beton,369,490 (oke),kontrol dua arah  syarat  ,φVc gaya geser, 9885,9 ton >  Vc kuat geser beton 5088,825 ton (oke), tulangan pondasi bore pile. Vc.,gaya geser 48,593 < Φ*Vc tahanan  geser  beton  60,625 (oke) jumlah  tulangan  pokok yang dibutuhkan 21 d19 dan tulangan sengkang d13, sesuai perhitungan dengan 15 bore pile mampu menahan beban – beban struktur atas jembatan.
Â
Kata Kunci: pondasi bore pile metode mayerhof
References
( Ir.H.J.Struyk ,Prof. Ir.K.H.C.W.van der Ven Soemargo , 1984 )
Agata Iwan Candra. “ Universitas Kadiri
Candra, A I, S W Mudjanarko, and Arthur Daniel Limantara. 2017. “Manajemen Data Lalu Lintas Kendaraan Berbasis Sistem Internet Cerdas Kadiri.†Semnastek 4 (2): 1–2. jurnal.umj.ac.id/index.php/semnastek.
Hadiyatmo, H.C. 2010. Analisis dan Desain Foundasi Bagian II. Gadjah Mada University press, Yogyakarta
4 Pamungkas. Anugrah ; Harianti. Erny.2013.Desain Pondasi Tahan Gempa Yogyakarta
Bowles, joseph E.1986. Analisa Dan Disain Pondasi Jilid 2 ; Erlangga,
Surendro,Bambang.2015.Rekayasa Fondasi Teori Dan Penyelesaian Soal.Yogyakarta:Graha ilmu
Badan Standarisasi Nasional. 2005. RSNI T-02-2005.
Ma’arif.faqih.2012.Analisis Strukur Jembatan .Yogyakarta; Universitas Negri Yogyakarta
Sardjono H.S., 1988. Pondasi Tiang Pancang Jilid I, Sinar Wijaya, Surabaya.
Bowless, J.E., 1988, Analisis dan Desain Pondasi Edisi Keempat Jilid 2, Erlangga, Jakarta
A., Hanggoro Tri Cahyo, 2006, Hand Out Rekayasa Pondasi 2, Pondasi Tiang Pancang, Jurusan Teknik Sipil – FT Universitas Negeri Semarang
Arifin, Zainul, 2007, Komparasi Daya Dukung Aksial Tiang Tunggal Dihitung dengan Beberapa Metode Analisis, Tesis, Program Pasca Sarjana, Universitas Diponegoro Semarang
Tambunan, Jhonson, 2012, Studi Analisis Daya Dukung Pondasi Tiang Pancang, Jurnal Rancang Sipil, Vol. 1, No. 1 : 21 – 30
Fahrani, Ferra dan Apriyanti, Yayuk, 2015, Analisis Daya Dukung Tanah dan Penurunan Pondasi Pada Daerah Pesisir Pantai Utara Kabupaten Bangka, Jurnal Fropil, Vol. 3, No. 2 : 89 – 95
Candra, A. I. (2017). ANALISIS DAYA DUKUNG PONDASI STROUS PILE PADA PEMBANGUNAN GEDUNG MINI HOSPITAL UNIVERSITAS KADIRI. Ukarst, 1(1), 63-70.
Utomo, P. (2004). Daya Dukung Ultimit Pondasi Dangkal Di Atas Tanah Pasir Yang Diperkuat Geogrid. Civil engineering dimension, 6(1), 15-20.
Widjaja, B. (2006). Kajian Pengaruh Setup pada Tiang Pancang terhadap Peningkatan Daya Dukung Pondasi (Studi Kasus Porto dan Jakarta). Jurnal Teknik Sipil Unika Soegijapranata, 3(1), 16-26.
Downloads
Published
How to Cite
Issue
Section
License
Authors who publish with this journal agree to the following terms:
(1) The copyright of published articles will be transferred to the journal as the publisher of the manuscript. Therefore, the author needs to confirm that the copyright has been managed by the publisher with the Publication Right Form which must be attached when submitting the article.
(2) Publisher of U Karst is Kadiri University.
(3) The copyright follows Creative Commons Attribution-ShareAlike License (CC BY SA): This license allows to Share copy and redistribute the material in any medium or format, Adapt remix, transform, and build upon the material, for any purpose, even commercially.