ANALISIS FAKTOR RISIKO PENAWARAN DI BAWAH ESTIMASI TERHADAP KINERJA KUALITAS PROYEK KONSTRUKSI BANGUNAN DI KOTA TRENGGALEK JAWA TIMUR
DOI:
https://doi.org/10.30737/ukarst.v2i2.373Abstract
A plan will correct delays in planning and control is  not done properly. Various things can occur in  a construction project that can lead to increased processing time so that the project becomes hampered. The purpose of the research is to discuss and classify the factors that cause delays in the implementation of development projects in the Trenggalek Regency and to accept factors of delay related to the use of costs. This data processing uses the SPSS (Statistical Product and Service Solution) computer program version 17.00. The data analysis technique uses validity, reliability, factor analysis, classical assumption and multiple linear regression.The results of the study are 3 new factors obtained from the extraction of factor analysis are: Changes in scope and employment documents (Xb1), Coordination and transportation of resources and expertise of manpower (Xb2), Evaluation and planning systems (Xb3) and produce one model of equation multiple linear to explain the relationship of the three factors above with costs.
Â
Keywords: Engineer, SPSS, Heteroscedasticity and Normality.
Â
Sebuah rencana akan memperbaiki keterlambatan dalam perencanaan dan kontrol tidak dilakukan dengan benar. Berbagai hal dapat terjadi dalam proyek konstruksi yang dapat menyebabkan peningkatan waktu pemrosesan sehingga proyek menjadi terhambat. Tujuan dari penelitian ini adalah untuk membahas dan mengklasifikasikan faktor-faktor yang menyebabkan keterlambatan dalam pelaksanaan proyek-proyek pembangunan di Kabupaten Trenggalek dan untuk menerima faktor keterlambatan terkait dengan penggunaan biaya. Pemrosesan data ini menggunakan program komputer SPSS (Produk Statistik dan Solusi Layanan) versi 17.00. Teknik analisis data menggunakan validitas, reliabilitas, analisis faktor, asumsi klasik, dan regresi linier berganda. Hasil penelitian ini adalah 3 faktor baru yang diperoleh dari ekstraksi analisis faktor yaitu: Perubahan ruang lingkup dan dokumen pekerjaan (Xb1), Koordinasi dan transportasi sumber daya dan keahlian tenaga kerja (Xb2), Evaluasi dan sistem perencanaan (Xb3) dan menghasilkan satu model persamaan linear berganda untuk menjelaskan hubungan ketiga faktor di atas dengan biaya.
Â
Kata Kunci: Insinyur, SPSS, Heteroskedastisitas dan Normalitas
References
DAFTAR PUSTAKA
Ahmed, S.M., Azhar S., Kappagntula P. and Gollapudil D. (2003). Delays in construction: a brief study of the Florida construction industry. Proceedings of the 39th Annual ASC Conference, Clemson University, Clemson, SC, pp. 25766.
Ahyari,Agus.1987. Pengendalian system Produksi.Buku 1 dan 2. BPEF: Yogyakarta.
Aibinu and Jagboro ,2002, The_ effects_ of_ construction_ delays_on_ project_delivery_ in_Nigerian_construction_id ustry. Alaghbari W.A.M., Razali M.A.K., Salim,
A. and Ernawati (2005). Factors affecting construction speed of industrialized building systems in Malaysia. Universiti Putra Malaysia: Master‟s thesis.
Assaf et al. (1995).Causes of delay in large building contruction project.
Austen A.D., danR.H. Neale, 1994, Manajemen Proyek Konstruksi Pedoman,Proses dan Prosedur, PPM dan PT Pustaka Binaman Pressindo, Jakarta.
Burhan Bungin, 2014, Metodologi Penelitian Kuantitatif. Jakarta:Kencana Prenamedia Group.
Callahan, M.T. 1992 Construction Project Scheduling, MC Graw-Hill New York.
Ervianto, Wulfram I. 2005. Manajemen Proyek Konstruksi.Yogyakarta: Andi Offset.
Ghozali, Imam 2013. Aplikasi Analisis Multivatiate dengan Program SPSS. Semarang: Badan Penerbit Universitas Diponegoro.
Kraiem, Z. K. danDiekman, J. E., 1987, Concurent Delays in Construction Projects, Journal of Construction Engineering and Management, ASCE, vol .
, no. 4, hal.591 602. Kusjadmika hadi, R. Amperawan. 1999. Studi Keterlambatan Kontraktor Dalam melaksanakan Proyek Konstruksi diDaerah Istimewa Yogyakarta. Yogyakarta: UGM.
Levis and Atherley.(1996). Delay construction. Langford: Cahner Books Internasional. Proboyo, Budiman. 1999. Keterlambatan Waktu Pelaksanaan Proyek Klasifikasi dan Peringkat dari Penyebab-penyebabnya.Program Pascasarjana Studi Manajemen Konstruksi Universitas Kristen Petra Surabaya. Surabaya.
Rai Widhiawati I.A, 2009, Penyebab Utama Dari Keterlambatan Penyelesaian Proyek Konstruksi Yang Berada Di Kotamadya Denpasar.
Soeharto, I., 1995, Manajemen Proyek, dari Konseptual sampai Operasional, Erlangga, Jakarta.
Suyatno, 2010, Analisis Faktor Penyebab Keterlambatan Penyelesaian Proyek Gedung (Aplikasi Model Regresi), Universitas Diponegoro, Semarang.
Limantara, A. D., Candra, A. I., & Mudjanarko, S. W. (2017). Manajemen Data Lalu Lintas Kendaraan Berbasis Sistem Internet Cerdas Ujicoba Implementasi Di Laboratorium Universitas Kadiri. Prosiding Semnastek.
Downloads
Published
How to Cite
Issue
Section
License
Authors who publish with this journal agree to the following terms:
(1) The copyright of published articles will be transferred to the journal as the publisher of the manuscript. Therefore, the author needs to confirm that the copyright has been managed by the publisher with the Publication Right Form which must be attached when submitting the article.
(2) Publisher of U Karst is Kadiri University.
(3) The copyright follows Creative Commons Attribution-ShareAlike License (CC BY SA): This license allows to Share copy and redistribute the material in any medium or format, Adapt remix, transform, and build upon the material, for any purpose, even commercially.