Meningkatkan Kemampuan Struktur Jembatan dengan Sistem Girder Pelat Baja pada Jembatan Golo, Tumpakoyot Blitar

Authors

  • Muhammad Yusuf Ansori Faculty of Engineering, Kadiri University
  • Edy Gardjito Faculty of Engineering, Kadiri University
  • Sigit Winarto Faculty of Engineering, Kadiri University
  • Fajar Romadhon Faculty of Engineering, Kadiri University
  • Haris Wicaksono Faculty of Engineering, Kadiri University

DOI:

https://doi.org/10.30737/jurmateks.v4i1.1693

Keywords:

Composite Bridge, Girder, Modification, Steel Plate

Abstract

The bridge becomes a vital building in living today, which is connecting two areas that separated land. The Golo Bridge also connects the two regions, Blitar and Tulungagung. The Golo Bridge in Tumpakoyot Blitar is part of a national project to build alternative and fast routes in the Southern Java alternative route. The existing Golo bridge is a bridge with a PC-I Girder structure 40 m long and 11 m wide. This research aims tore-plan or modify it to become a bridge with a steel plate girder structure by dividing it into 2 spans, collecting the existing data to be processed in the analysis calculation. It's started with determining the dimensions of the initial structure, giving loads, controlling the structure's ability, also for the abutment & pier. The calculation shows that the dimensions of the steel plate girder have a profile of 2500. 700. 14. 40 mm. Meanwhile, the abutment has a total height of 5.70 m, a width of 4.50 m, and 9.50 m. The bridge pillars have a total height of 6.20 m, a width of 6.20 m and a length of 9.50 m. These results show that the structures is able to support the working loads.

References

H. R. Agustapraja and D. Kartikasari, “Studi Evaluasi Pekerjaan Struktur Box Culvert Pada Proyek Pembangunan Jembatan Kucing Ruas Sukodadi – Sumberwudi Kabupaten Lamongan,†UKaRsT, vol. 1, no. 1, pp. 50–59, 2017.

R. E. Wibisono, “Analisa Dampak Lalu Lintas Jalan Tambak Osowilangun Akibat Pembangunan Teluk Lamong Surabaya,†UKaRsT, vol. 4, no. 1, pp. 69–83, 2020, doi: 10.1016/j.jtte.2017.12.002.A.

T. Nasution, “Pengenalan Jembatan Baja,†2012.

A. S. Supriyadi, Bambang; Muntohar, Jembatan. Yogyakarta: Beta Offset, 2007.

Direktorat Jendral Bina Marga, “Perencanaan Jembatan,†Bina Marga, 2017.

F. Santoso, “Tinjauan Bangunan Bawah (Abutment) Jembatan Karang Kecamatan Karangpandan Kabupaten Karanganyar,†Universitas Sebelas Maret Surakarta, 2009.

D. Zhuang, R. Xiao, L. Jia, and B. Sun, “Failure analysis for overall stability against sliding and overturning of a girder bridge,†Eng. Fail. Anal., vol. 109, p. 104271, 2020, doi: 10.1016/j.engfailanal.2019.104271.

X. F. Shi, Y. W. Niu, and X. Ruan, “Strengthening of an excessively deflected ten years old longspan prestressed concrete bridge,†2008.

A. Susanto, Y. Cahyo, and S. Winarto, “Studi Perencanaan Jembatan Cumpleng Dengan Metode Pratekan Di Kec. Slahung Kabupaten Ponorogo,†Jurmateks, vol. 1, no. 2, pp. 172–181, 2018, doi: 10.30737/jurmateks.v1i2.375.

FHWA, LRFD Design Example for Steel Girder Superstructure Bridge. 2006.

BSN (Badan Standarisasi Nasional), “SNI 1725:2016 Standar pembebanan untuk jembatan,†Badan Stand. Indones., 2016.

BSN (Badan Standardisasi Nasional), “RSNI T-02-2005 Pembebanan untuk Jembatan,†Badan Stand. Indones., 2005.

B. R. Jeon, N. Chitrapriya, M. I. Kwak, M. J. Jung, S. K. Kim, and Y. J. Jang, “Effect of the bridge structure on the binding mode of the binuclear ruthenium complex to native DNA,†J. Mol. Struct., vol. 1199, p. 126954, 2020, doi: 10.1016/j.molstruc.2019.126954.

R. J. P. I. Takwa, “Modifikasi Desain Struktur Jembatan Ngancar Kabupaten Ngawi dengan Sistem Gelagar Beton Pratekan,†Institut Teknologi Sepuluh Nopember Surabaya, 2017.

BSN (Badan Standardisasi Nasional), “RSNI T-03-2005 Perencanaan Struktur Baja Untuk Jembatan,†Badan Stand. Indones., 2005.

T. Y. Purnomo, L. D. Krisnawati, and Y. C. S. Purnomo, “Kajian Jembatan Kecamatan Sendang (Ruas Jalan Tugu-Pabyongan) Kabupaten Tulungagung dengan Metode Komposit,†J. Manaj. Teknol. Tek. Sipil, vol. 1, no. 1, pp. 112–125, 2018, doi: 10.30737/jurmateks.v1i1.145.

Departemen Pekerjaan Umum, “Pelatihan Site Inspector of Bridge Modul (Inspektur Lapangan Pekerjaan Jembatan),†PUPR, 2006.

A. A. Saputra, S. Winarto, and A. Ridwan, “Perencanaan Struktur Baja Pada Konstruksi Empat Lantai Pada Hotel Jaya Baya,†J. Manaj. Teknol. Tek. Sipil, vol. 1, no. 2, pp. 67–73, 2018, doi: 10.30737/jurmateks.v1i2.382.

S. H. Kim, J. Choi, S. J. Park, J. H. Ahn, and C. Y. Jung, “Behavior of composite girder with Y-type perfobond rib shear connectors,†J. Constr. Steel Res., pp. 275–289, 2014, doi: 10.1016/j.jcsr.2014.09.012.

A. A. Oktavano, “Perencanaan Ulang Jembatan Mlandingan Desa Mlandingan Kulon Kabupaten Situbondo Menggunakan Struktur Komposit,†Universitas Jember, 2015.

Direktorat Jendral Bina Marga, “Pemilihan Teknologi Expansion Joint (Siar Muai) untuk Jembatan dengan Perkerasan Kaku,†Bina Marga, 2020.

S. Maalek, R. Akbari, and S. Ziaei-Rad, “Estimation of elastomeric bridge bearing shear modulus using operational modal analysis,†2007.

Kementerian Pekerjaan Umum dan Perumahan Rakyat, “Surat Edaran Menteri tentang Pedoman Perancangan Bantalan Elastomer untuk Perletakan Jembatan,†Bina Marga, 2015.

H. Wahyudiono and S. Anam, “Perencanaan Pondasi Bore Pile Pada Proyek Jembatan Ngujang II Kab.Tulungagung,†U KaRsT, vol. 2, no. 1, pp. 20–27, 2018.

B. A. Wiratmoko; S. Winarto; Y. C. S. Purnomo, “Perencanaan Pondasi Tiang Pancang Gedung Ketahanan Pangan Nganjuk,†Jurmateks, vol. 2, no. 1, pp. 106–120, 2019.

C. Girsang, P. P. Rahardjo, A. Lim, and C. E. Faculty, “Investigation of Pile Behavior Toward Abutment Construction using PLAXIS 3D: Case Study on Lembak Bridge,†UKaRsT, vol. 5, no. 1, pp. 1–16, 2021, doi: 10.17577/ijertv4is030269.

S. Rohadi, D. Ariadi, and B. Mochtar, “Perencanaan Struktur Bangunan Bawah Abutment Jembatan Desa Sekerat Kecamatan Bengalon Kabupaten Kutai Timur,†KURVA S J. Mhs., vol. 1, no. 1, pp. 495–511, 2018.

Kementerian Pekerjaan Umum dan Perumahan, “Perencanaan Pembangunan Jalan BTS. Tulungagung / Blitar/ P. Molang - Bululawang,†Direktorat Jenderal Bina Marga, 2018.

PlumX Metrics

Published

2021-07-09

Issue

Section

Articles