PERENCANAAN PONDASI SUMURAN PADA PROYEK PEMBANGUNAN GEDUNG ASRAMA BALAI PEMBANGUNAN SDM DAN PERTANIAN BANTUL DIY
DOI:
https://doi.org/10.30737/jurmateks.v3i1.888Keywords:
Well Foundation, Soil Carrying Capacity, Sattlement, ReinforcementAbstract
The foundation serves to hold the burden on the upper structure, which is transmitted to the soil layer. Data collection uses primary and secondary data, as well as direct visits to the development project site. The choice of wells foundation because of the restricted location of restricted location and minimal vibration chose the wells foundation as a method of implementation. There are two types of foundation types, namely P1 type with a load of 46.093 tons and P2 type of foundation with a load of 78.517 tons. The carrying capacity of the land for type 1 was 59,227 tons, with a decrease of 0,143 Cm. While the carrying capacity of P2 type is 118.1 tons with a reduction in type 2 of 0.202 Cm. The maximum reduction requirement is 2.5 Cm, then of each kind of foundation the safe reduction condition. The planned foundation of the primary reinforcement uses 12 D19, and the spiral reinforcement uses Ø10-100. For support of the pile cap, the X direction uses D19-175, and the Y direction uses D19-175.
Pondasi berfungsi untuk menahan beban pada struktur atas yang diteruskan ke lapisan tanah. Perolohan data menggunakan data primer dan sekunder, serta meninjau langsung ke tempat proyek pembangunan. Pemilihan pondasi sumuran karena lokasi sempit lokasi sempit dan minim getaran memilih pondasi sumuran sebagai metode pelaksanaan. Terdapat 2 jenis tipe pondasi, yaitu tipe P1 dengan beban yang dipikul sebesar 46,093 ton dan tipe pondasi P2 dengan beban yang dipikul sebesar 78,517 ton. Daya dukung tanah untuk tipe 1 sebesar 59,227 ton, dengan penurunan sebesar 0,143 Cm. Sedangkan daya dukung tanah tipe P2 sebesar 118,1 ton dengan penurunan tipe 2 sebesar 0,202 Cm. syarat penurunan maksimal adalah 2,5 Cm, maka dari masing-masing tipe pondasi syarat penurunan aman. Pondasi yang direncanakan tulangan utama menggunakan 12 D19 dan tulangan spiral menggunakan Ø10 – 100. Untuk penulangan pile cap arah X menggunakan D19 – 175 dan arah Y menggunakan D19 – 175.
References
S. Susanto, “PERBANDINGAN FUNGSI KEANGGOTAAN TIPE SEGITIGA DAN TIPE GBELLTERHADAPANALISIS RISIKO,†vol. 3, no. 2, pp. 57–67, 2019.
et al., “Studi Perbandingan Pondasi Tiang Pancang Dengan Pondasi Bore Pile (Studi Kasus: Pelaksanaan Pembangunan Pondasi Tower Grand Kamala Lagoon-Bekasi),†J. Tek. Sipil ITP, vol. 7, no. 1, pp. 26–33, 2020, doi: 10.21063/jts.2019.v701.04.
F. Ulum, “Konstruksi Sistem Ekonomi Islam Menuju Kesejahteraan yang Merata,†J. Chem. Inf. Model., vol. 53, no. 9, p. 287, 2008, doi: 10.1017/CBO9781107415324.004.
W. Jawat, “Metode Pelaksanaan Pekerjaan Pondasi (Studi: Proyek Fave Hotel Kartika Plaza),†Padur. J. Tek. Sipil Univ. Warmadewa, vol. 4, no. 2, pp. 22–34, 2017.
S. Bawataa et al., “Kelayakan Material Domato Di Pulau Karakelang Kabupaten Kepulauan Talaudsebagai Material Lapis,†Sipil statik, vol. 3, no. 8, pp. 590–598, 2015.
F. Febriantoro, Y. C. S. Purnomo, and A. Ridwan, “Study Perencanaan Pondasi Tiang Pancang Jembatan Sembayat Baru II Kecamatan Manyar Kabupaten Gresik,†J. Manaj. Teknol. Tek. Sipil, vol. 1, no. 1, pp. 148–159, 2018, doi: 10.30737/jurmateks.v1i1.147.
I. Sundari, M. Lubis, A. Lukman, and D. Tanjung, “PERENCANAAN DESAIN PEKERJAAN PEMBANGUNAN PONTON UKURAN 8 METER X 16 METER TERMINAL PENUMPANG DERMAGA A DUMAI,†vol. 15, no. 2, pp. 101–106, 2020.
Y. Yudiawati and A. Marzuki, “Pondasi Dangkal diatas Tanah Lunak dengan Perkuatan Cerucuk Galam Berdasarkan Percobaan Lapangan,†Info Tek., vol. 9, no. 2, pp. 212–217, 2008.
R. I. Kurniawan, A. Ridwan, S. Winarto, and A. I. Candra, “PERENCANAAN PONDASI TIANG ( Studi Kasus HOTEL MERDEKA TULUNGAGUNG ),†Jurmateks, vol. 2, no. 1, pp. 144–153, 2019.
D. Sukmawan, “Analisis Penentuan Tipe Fondasi Pilar Jembatan Dengan Menggunakan Metode Analytical Hierarchy Process (AHP) (Studi Kasus: Pembangunan Jembatan Walahar Kecamatan Ciampel, Kabupaten Karawang),†Techno-Socio Ekon., vol. 13, no. 1, pp. 31–45, 2019, doi: 10.32897/techno.2019.13.1.3.
F. Fahriani and Y. Apriyanti, “Daya Dukung dan Penurunan Pondasi pada Pesisir Pantai Timur Kabupaten Bangka,†BENTANG J. Teor. dan Terap. Bid. Rekayasa Sipil, vol. 8, no. 1, pp. 38–47, 2020, doi: 10.33558/bentang.v8i1.1949.
D. Hartanto, Y. Cahyo, S. Winarto, and A. I. Candra, “PERENCANAAN PONDASI TIANG PANCANG PADA GEDUNG SEKRETARIAT DEWAN DPRD KABUPATEN KEDIRI,†Jurmateks, vol. 1, no. 2, pp. 303–312, 2018.
B. Tami et al., “PENGARUH PERKUATAN GEOTEKSTIL TIPE WOVEN GX-50 TERHADAP KERUNTUHAN PONDASI PADA PASIR PANTAI,†vol. 6, no. 1, pp. 23–31, 2019.
J. Onding, L. S. Balamba, O. B. A. Sompie, and A. N. Sarajar, “Analisis Kestabilan Pondasi Jembatan Studi Kasus : Jembatan Essang-Lalue,†J. Sipil Statik, vol. 1, no. 11, pp. 730–744, 2013.
A. Novia et al., “METODE DAN WAKTU PELAKSANAAN JEMBATAN LAPEHAN KECAMATAN MAKMUR KABUPATEN BIREUEN DENGAN MENGGUNAKAN NETWORK PLANNING Muhammad,†vol. 02, no. 02, pp. 1–77, 2018.
A. I. Candra, A. Yusuf, and A. R. F, “Studi Analisis Daya Dukung Pondasi Tiang Pada Pembangunan Gedung Lp3m Universitas Kadiri,†CIVILLa, vol. 3, no. 2, pp. 166–171, 2018.
A. I. Candra, H. Wahyudiono, S. Anam, and D. Aprillia, “KUAT TEKAN BETON Fc ’ 21 , 7 MPa MENGGUNAKAN WATER REDUCING AND HIGH RANGE ADMIXTURES,†vol. 5, no. 1, 2020.
V. E. Purba, “KAJIAN PEMILIHAN PONDASI SUMURAN SEBAGAI ALTERNATIF PERANCANGAN PONDASI,†J. Ranc. Sipil, vol. 2, no. 1, pp. 42–49, 2013.
A. I. Candra, “Pada Pembangunan Gedung Mini Hospital Universitas Kadiri,†Ukarst, vol. 1, no. 1, pp. 63–70, 2017.
IPLT SUKAWINATAN, “PERENCANAAN INSTALASI PENGOLAHAN LUMPUR TINJA SISTEM KOLAM KOTA PALEMBANG,†vol. 1, no. 1, pp. 74–79, 2013.
A. K. E. C. Banjarsari and J. Barat, “GEDUNG SEKOLAH SMK PEMBANGUNAN NASIONAL,†vol. 4, no. 2, pp. 14–29, 2016.
A. I. Candra, S. Anam, Z. B. Mahardana, and A. D. Cahyono, “e ISSN 2581-0855 STUDI KASUS STABILITAS STRUKTUR TANAH LEMPUNG,†vol. 2, no. 2, pp. 88–97, 2018.
Badan Standardisasi Nasional, “Tata Cara Perhitungan Struktur Beton Untuk Bangunan Gedung. SNI 03-2847-2002,†Bandung Badan Stand. Nas., vol. umum, p. 251, 2002.
Downloads
Published
Issue
Section
License
Authors who publish with this journal agree to the following terms:
(1) The copyright of published articles will be transferred to the journal as the publisher of the manuscript. Therefore, the author needs to confirm that the copyright has been managed by the publisher with the Publication Right Form which must be attached when submitting the article.
(2) Publisher of JURMATEKS is Kadiri University.
(3) The copyright follows Creative Commons Attribution-ShareAlike License (CC BY SA): This license allows to Share copy and redistribute the material in any medium or format, Adapt remix, transform, and build upon the material, for any purpose, even commercially.