Vol. 4 No. 2 (2021): April

					View Vol. 4 No. 2 (2021): April
Published: 2021-03-31

Articles

  • Usulan Perbaikan Sistem Kerja Di Area Gudang Menggunakan Metode Rula Dan Owas Di Proyek Pembangunan Jalan Tol Cisumdawu Phase 2 PT Wijaya Karya (Persero) Tbk

    Deny Setiawan, Zeny Fatimah Hunusalela, Rina Nurhidayati
    78-90
    DOI: https://doi.org/10.30737/jatiunik.v4i2.999
    Abstract views: 36036 ,
  • Penerapan Metode Saving Matrix Dan Algoritma Nearest Neighbor Dalam Menentukan Rute Distribusi Untuk Meminimalkan Biaya Transportasi Pada PT. XYZ

    Viva Arfana Perdana, Zeny Fatimah Hunusalela, Aliffia Teja Prasasty
    91-105
    DOI: https://doi.org/10.30737/jatiunik.v4i2.1000
    Abstract views: 5207 ,
  • Usulan Sistem Informasi Manajemen Inventory Pembanunan Jalan Tol Cisumdawu Phase 2 Berbasis Digital Business Eco-System (Dbe) Pada Pt. Wijaya Karya

    Bagus Mai Prathama, Zeny Fatimah Hunusalela, Mei Lestari
    106-118
    DOI: https://doi.org/10.30737/jatiunik.v4i2.1002
    Abstract views: 823 ,
  • Impelemtasi Distribution Requrement Planning Dan Saving Matrixs Untuk Meminalisasi Biaya Distribusi

    Fazril Adien Saputra
    119-131
    DOI: https://doi.org/10.30737/jatiunik.v4i2.1578
    Abstract views: 802 ,
  • PENGARUH INSENTIF, KEPEMIMPINAN DAN DISIPLIN KERJA TERHADAP KINERJA KARYAWAN

    Reza Mei Setiawan, Silvi Rushanti Widodo, Afiff Yudha Tripariyanto
    132-140
    DOI: https://doi.org/10.30737/jatiunik.v4i2.1617
    Abstract views: 1308 ,
  • Strategi Pemasaran Dengan Menggunakan Analisis SWOT Pada Hotel ( Studi Kasus Pada Lotus Garden Hotel )

    Verdinan Adha Aprilila, Lolyka Dewi Indrasari, Heribertus Budi Santoso
    141-152
    DOI: https://doi.org/10.30737/jatiunik.v4i2.1618
    Abstract views: 1007 ,