Integrating Ecocriticality and Critical Path Method for Enhancing Time Efficiency and Reduce Environmental Impact
DOI:
https://doi.org/10.30737/ukarst.v9i2.7036Keywords:
Critical Path Method, Ecocriticality, Environmental Impact, Project Scheduling, Time EfficiencyAbstract
Time efficiency and environmental responsibility are increasingly recognized as essential dimensions of modern construction management. However, most scheduling studies using the Critical Path Method (CPM) primarily focus on duration optimization, whereas the ecological impacts associated with critical activities remain overlooked. This study aims to combine CPM with an ecocriticality-based assessment of time efficiency by considering the associated ecological burden. A case study was conducted on the construction of the Integrated Laboratory and Landscape Building at the Habibie Institute of Technology in Parepare, Indonesia. Project scheduling data, cost budget documents, and material volume records were analyzed to identify critical path activities and quantify their ecological burden. Ecocriticality Index (IE) was assessed based on four weighted environmental parameters, such as material consumption, solid waste generation, reuse potential, and embodied emissions. The results show that the integration of CPM with Ecocriticality provides a more comprehensive scheduling basis by simultaneously combining time efficiency and ecological burden. Its application resulted in an optimal duration of 1 week faster and identified floor and foundation elements with the highest environmental impact and located on the critical path. This integration also produced three priority schemes that can be used as a basis for selecting intervention strategies. These findings confirm that project acceleration decisions cannot be separated from ecological assessments. The integration of CPM and Ecocriticality provides an approach that can be applied to various projects to improve time efficiency while reducing environmental impacts and supporting sustainable construction.
References
[1] M. Gangolells, M. Casals, S. Gassó, N. Forcada, X. Roca, and A. Fuertes, “A methodology for predicting the severity of environmental impacts related to the construction process of residential buildings,” Build. Environ., vol. 44, no. 3, pp. 558–571, 2009.
[2] S. Supardi and A. Ahmadsyah, “Tinjauan Waktu Pelaksanaan Proyek Menggunakan Microsoft Project 2021 pada Pembangunan Pesantren Entrepeneurship Kabupaten Lebak Provinsi Banten,” vol. 8, no. 2, pp. 159–169, 2023.
[3] G. C. Perrucci, D. V., Wilson, J., Brown, R., Camey, J. M., & Buitrago, “Using the critical path method (CPM) for evaluating allocation potential of temporary housing units. Journal of Housing and the Built Environmen,” 2025, [Online]. Available: https://ui.adsabs.harvard.edu/abs/2025JHTRW..40.1113P/abstract
[4] K. Kim, “Generalized resource-constrained critical path method to identify resource-dependent activities. Sustainability, 12(22), 9544,” 2020, [Online]. Available: https://ideas.repec.org/a/gam/jsusta/v12y2020i21p8918-d435439.html
[5] T. Afolabi, A., Oyeyipo, O., Ojelabi, R., & Mosaku, “Application of critical path method for project scheduling in construction management. Journal of Construction Engineering and Management, 148(3), 04022004,” 2022.
[6] N. C. Husna, R. A. U., Ilmiyah, N. F., & Resti, “Implementasi CPM dan PERT dalam Memprediksi Durasi serta Biaya Pembangunan Musala Al-Ikhlas di Kotawaringin Barat,” Journal Focus Action of Research Mathematic, 2020.
[7] A. B. M. S. A. Muhammad, “Analisa Perhitungan Pekerjaan Reparasi Kapal Dengan Metode Critical Path Method (CPM): cpm. SPECTA Journal of Technology, 4(1),” pp. 84–91, 2020.
[8] R. S. Hasibuan, E. S., Siregar, E. B., Batubara, F. H., Rambe, M. V. R., & Lubis, “Analisa Manajemen Waktu Pelaksanaan Administrasi Di Dinas Kehutanan Provinsi Sumatera Utara Dengan Metode CPM. Jurnal IPTEK Bagi Masyarakat, 2(2),” pp. 60–68, 2022.
[9] G. Garrard, The Oxford handbook of ecocriticism. Oxford University Press, 2014.
[10] S. Banihashemi, S. A., Hosseini, M. R., Golizadeh, H., & Sankaran, “Investigating the environmental impacts of construction projects in time–cost trade-off problems using multi-criteria decision-making. Sustainability,” 2021.
[11] T. K. Lim, “Integrated carbon emission estimation method for construction projects based on activity data. Building and Environment, 105,” pp. 307–316, 2016.
[12] W. R. Nasir, H., Haas, C. T., & Fagerlund, “Mine A Proactive Risk Assessment Framework to Maximize Schedule Benefits of Modularization in Construction Projects A Proactive Risk Assessment Framework to Maximize Schedule Benefits of Modularization in Construction Projects,” vol. 148, no. 7, 2020, doi: 10.1061/(ASCE)CO.1943-7862.0002311.
[13] A. Śliwa, “Ecocritical interpretation of natural and virtual elements in the residential environment. Architecture, Civil Engineering, Environment, 16(4),” pp. 59–67, 2023.
[14] F. D. N. Yulianti, “Tinjauan Waktu Proyek Menggunakan Metode Critical Path Method-CPM (Studi Kasus Proyek Perumahan Rolling Hills 5 PT Rancang Komunika Mandiri),” 2023.
[15] A. R. Suhardi, M. Haizam, and M. Saudi, “Implementation of Critical Path Method in House Development Scheduling Type 300 / 350 in CV . HILMY Jaya,” vol. 6, no. 11, 2019.
[16] A. T. Yudhistira, T. F. Fathani, A. Setiawan, B. Nugroho, and U. G. Mada, “Practical Optimization of Access Road Construction Methods in Soft Soil Areas,” Media Komun. Tek. Sipil, vol. 29, no. 2, pp. 289–299, 2024, doi: 10.14710/mkts.v29i2.56309.
[17] J. Xu, H. Zheng, Z. Zeng, S. Wu, and M. Shen, “Discrete time–cost–environment trade-off problem for large-scale construction systems with multiple modes under fuzzy uncertainty and its application to Jinping-II Hydroelectric Project,” Int. J. Proj. Manag., vol. 30, no. 8, pp. 950–966, 2012.
[18] N. Farazmand and M. Beheshtinia, “Multi-objective optimization of time-cost-quality-carbon dioxide emission-plan robustness in construction projects,” J. Ind. Syst. Eng., vol. 11, no. 3, pp. 102–125, 2018.
[19] A. Salmasnia, E. Heydarnezhad, and H. Mokhtari, “A Robust Optimization Approach for a Discrete Time-Cost- Environment Trade-off Project Scheduling Problem Under Uncertainty,” Int. J. Ind. Eng. Prod. Res., vol. 35, no. 2, pp. 1–18, 2024, doi: 10.22068/ijiepr.35.2.1897.
[20] S. A. Banihashemi, M. Khalilzadeh, and E. K. Zavadskas, “Investigating the Environmental Impacts of Construction Projects in Time-Cost Trade-Off Project Scheduling Problems with CoCoSo Multi-Criteria Decision-Making Method,” Sustainability, vol. 13, 2021.
[21] T. S. Soeparyanto, R. Nuhun, H. Ariatno, L. Ode, and M. Zulfitrah, “Analisis Penjadwalan Proyek Dengan Metode CPM ( Studi Kasus Pembangunan Mushola Di Kompleks Empalecement PT . X ) Analysis Of Project Scheduling Using The CPM Method ( Case Study Of Prayer Room Construction In PT . X Empalecement Complex ),” vol. 5, no. June, 2024, doi: 10.37253/jcep.v5i1.9206.
[22] H. R. Hana, “Analysis of Project Acceleration Implementation Using the CPM and PERT at Lettu Imam Building,” vol. 19, pp. 121–133, 2022.
[23] L. Buell, The future of environmental criticism: Environmental crisis and literary imagination. John Wiley & Sons, 2009.
[24] S. O. Ajayi et al., “Waste effectiveness of the construction industry: Understanding the impediments and requisites for improvements,” Resour. Conserv. Recycl., vol. 102, pp. 101–112, 2015.
[25] A. Nawarathna, M. Siriwardana, and Z. Alwan, “Embodied Carbon as a Material Selection Criterion : Insights from Sri Lankan Construction Sector,” pp. 1–19, 2021.
[26] E. Marzouk, M., & Abdelakder, “Assessing environmental impact indicators in construction projects. Journal of Cleaner Production,” no. 142, pp. 205–216, 2017,
[27] G. K. C. Ding, “Sustainable construction—The role of environmental assessment tools,” Construction Management and Economics, vol. 26, no. 3, pp. 213–224, 2008, doi: 10.1080/01446190801918744.
[28] C. J. Kibert, Sustainable Construction: Green Building Design and Delivery, 3rd ed. Hoboken, NJ, USA: John Wiley & Sons, 2016
[29] W. C. Y. Tam,V.W.Y.,Tam,C,M,.Zeng, S.X., & Ng., “Prefabrication as a means of minimizing construction waste on site. International Journal of Construction Management,” vol. 45–51, 2004,
Downloads
Published
Issue
Section
License
Copyright (c) 2025 Suriati Abd. Muin, Dr. Ir. Watono, MT, Cindy Melanie Putri, Salsabila Al-Asfahany

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Authors who publish with this journal agree to the following terms:
(1) The copyright of published articles will be transferred to the journal as the publisher of the manuscript. Therefore, the author needs to confirm that the copyright has been managed by the publisher with the Publication Right Form which must be attached when submitting the article.
(2) Publisher of U Karst is Kadiri University.
(3) The copyright follows Creative Commons Attribution-ShareAlike License (CC BY SA): This license allows to Share copy and redistribute the material in any medium or format, Adapt remix, transform, and build upon the material, for any purpose, even commercially.
Deprecated: json_decode(): Passing null to parameter #1 ($json) of type string is deprecated in /home/ojs.unik-kediri.ac.id/public_html/plugins/generic/citations/CitationsPlugin.php on line 68