RETRACTED: Construction Schedule Management for Densely Populated Areas Using CPM-Crashing

Authors

  • Tsulis Iq'bal Khairul Amar Civil Engineering Department, Faculty of Engineering, Muhammadiyah University of Surakarta, Surakarta, Indonesia
  • Fresti Febria Astuti Civil Engineering Department, Faculty of Engineering, Muhammadiyah University of Surakarta, Surakarta, Indonesia
  • Vivi Tri Wulandari Civil Engineering Department, Faculty of Engineering, Muhammadiyah University of Surakarta, Surakarta, Indonesia

DOI:

https://doi.org/10.30737/ukarst.v7i2.4815

Keywords:

Acceleration, CPM-Crashing, Cost, Densely Populated Area, Time

Abstract

This article has been retracted: please see U Karst Policy on Article Withdrawal.

(https://ojs.unik-kediri.ac.id/index.php/ukarst/article-retraction)

This article has been retracted at the request of the Editor-in-Chief.

This decision was taken because it was discovered that almost the same article had been published earlier on October 31, 2023, in the Jurnal Teknik Sipil: Rancang Bangun (https://ejournal.um-sorong.ac.id/index.php/rancangbangun/article/view/2632). The author was identified as having made multiple submissions, namely submitting a manuscript in the U Karst Journal on July 3, 2023, and also submitting almost the same manuscript in the Jurnal Teknik Sipil: Rancang Bangun on August 24, 2023.

The Editors deplore the practice of simultaneous multiple submissions of papers to different journals. As such this article represents a severe abuse of the scientific publishing system. The scientific community takes a very strong view on this matter, and we apologize to the journal readers that this was not detected during the submission process.

Downloads

PlumX Metrics

Published

2023-11-30

How to Cite

Amar, T. I. K., Astuti, F. F., & Wulandari, V. T. (2023). RETRACTED: Construction Schedule Management for Densely Populated Areas Using CPM-Crashing. UKaRsT, 7(2), 202–216. https://doi.org/10.30737/ukarst.v7i2.4815

Issue

Section

Articles