Vol. 1 No. 2 (2018): OCTOBER

Articles

  • STUDI PERENCANAAN JEMBATAN CUMPLENG DENGAN METODE PRATEKAN DI KEC. SLAHUNG KABUPATEN PONOROGO

    Adi Susanto, Yosef Cahyo, Sigit Winarto
    172-181
    DOI: https://doi.org/10.30737/jurmateks.v1i2.375
    Abstract views: 1801 ,
  • PERENCANAAN STRUKTUR ATAS ASRAMA PUTRI DI UNIVERSITAS KADIRI

    Renaldi Oza Pubawa, Ahmad Ridwan, Yosef Cahyo Setianto Purnomo
    182-191
    DOI: https://doi.org/10.30737/jurmateks.v1i2.376
    Abstract views: 1607 ,
  • PERENCANAAN CHECKDAM KALI NGASINAN KANAN DESA NOTOREJO KECAMATAN GONDANG KABUPATEN TULUNGAGUNG

    Ahmad Nashirudin, Sigit Winarto, Sudjati Sudjati
    192-203
    DOI: https://doi.org/10.30737/jurmateks.v1i2.377
    Abstract views: 664 ,
  • PENELITIAN PENAMBAHAN BAHAN ADITIF KAPUR HIDRAT KAPUR PADAM SEBAGAI BAHAN PENGISI FILLER PADA CAMPURAN ASPAL BETON

    Candra Yulianto, Yosef Cahyo Setianto Purnomo, Ahmad Ridwan, Agata Iwan Candra
    204-215
    DOI: https://doi.org/10.30737/jurmateks.v1i2.378
    Abstract views: 791 ,
  • PERENCANAAN PONDASI TIANG PANCANG PADA GEDUNG UNIVERSITAS TULUNGAGUNG

    Imam Mustofa, Sigit Winarto, Ahmad Ridwan
    216-226
    DOI: https://doi.org/10.30737/jurmateks.v1i2.379
    Abstract views: 2620 ,
  • STUDI PERENCANAAN STRUKTUR PONDASI TIANG PANCANG GEDUNG FAKULTAS SYARIAH IAIN PONOROGO

    Lin Sintyawati, Sigit Winarto, Ahmad Ridwan, Agata Iwan Candra
    227-237
    DOI: https://doi.org/10.30737/jurmateks.v1i2.380
    Abstract views: 3799 ,
  • ANALISIS DAMPAK LALU LINTAS PENGEMBANGAN PASAR PON TRENGGALEK

    Dwi Kriswanto, Ahmad Ridwan, Sigit Winarto
    238-247
    DOI: https://doi.org/10.30737/jurmateks.v1i2.381
    Abstract views: 991 ,
  • PERENCANAAN STRUKTUR BAJA PADA KONSTRUKSI EMPAT LANTAI PADA HOTEL JAYA BAYA

    Alfin Aziz Saputra, Sigit Winarto, Ahmad Ridwan
    248-258
    DOI: https://doi.org/10.30737/jurmateks.v1i2.382
    Abstract views: 5070 ,
  • ANALISA PLAT KONVENSIONAL DENGAN PLATE FLATES PADA GEDUNG BPN KOTAMADYA MALANG

    Musa Al Asyari, Yosef Cahyo, Sigit Winarto
    259-269
    DOI: https://doi.org/10.30737/jurmateks.v1i2.383
    Abstract views: 781 ,
  • PENELITIAN CAMPURAN ASPAL BETON MENGGUNAKAN PASIR VULKANIK GUNUNG KELUD DENGAN LIMBAH BOTOL PLASTIK

    Cici Sri Isma Evrilyana, Ahmad Ridwan, Yosef Cahyo Setianto
    270-280
    DOI: https://doi.org/10.30737/jurmateks.v1i2.384
    Abstract views: 1169 ,
  • ANALISA PERBANDINGAN MANAJEMEN WAKTU ANTARA PERENCANAAN DAN PELAKSANAAN

    Rohmatun Hidayah, Ahmad Ridwan, Yosef Cahyo
    281-290
    DOI: https://doi.org/10.30737/jurmateks.v1i2.416
    Abstract views: 10422 ,
  • PERENCANAAN PENINGKATAN JALAN PADA RUAS JALAN PACITAN-NGADIROJO

    Bakhtiar Andhi Harsono, Sigit Winarto, Yosef Cahyo Setianto
    291-302
    DOI: https://doi.org/10.30737/jurmateks.v1i2.417
    Abstract views: 2596 ,
  • PERENCANAAN PONDASI TIANG PANCANG PADA GEDUNG SEKRETARIAT DEWAN DPRD KABUPATEN KEDIRI

    Dwi Hartanto, Yosef Cahyo S, Sigit Winarto, Agata Iwan Candra
    303-312
    DOI: https://doi.org/10.30737/jurmateks.v1i2.418
    Abstract views: 1636 ,
  • PERBANDINGAN KEKUATAN BETON DENGAN CAMPURAN DRAMIX STEEL FIBER DAN TULANGAN WIREMESH PADA RIGID PAVEMENT

    Two Puji Guntur A, Yosef Cahyo, Sigit Winarto, Agata Iwan Candra
    313-324
    DOI: https://doi.org/10.30737/jurmateks.v1i2.419
    Abstract views: 2389 ,
  • JOB MIX LASTON (AC-BC) MENGGUNAKAN BUBUK GYPSUM DAN ABU BATA MERAH

    Moch Aminuddin, Agata Iwan Candra, Yosef Cahyo S
    325-336
    DOI: https://doi.org/10.30737/jurmateks.v1i2.420
    Abstract views: 1050 ,