PERENCANAAN STRUKTUR BAJA PADA KONSTRUKSI EMPAT LANTAI PADA HOTEL JAYA BAYA

Authors

  • Alfin Aziz Saputra Fakultas Teknik Universitas Kadiri
  • Sigit Winarto Fakultas Teknik Universitas Kadiri
  • Ahmad Ridwan Fakultas Teknik Universitas Kadiri

DOI:

https://doi.org/10.30737/jurmateks.v1i2.382

Keywords:

Steel Structure Planning, LRFD, SNI 1729-2015, Planning

Abstract

Construction buildings in Kediri area still tends to use concrete construction with conventional methods, which are prone to specifications from planning the structure of the building. Due the process of making cast dough and casting it is often not done properly so it can eliminate the strength and structure. Therefore, hotel building is planned to use Steel Construction and Precast Floor Elimination, in order to have not reduction in specification design structure. In LRFD method, probability analysis is not needed, except for general situations not set in Regulations Obtained LRFD planning calculations referring to the latest SNI 1729-2015. Based on the planning, the calculation structure of loading is calculated in m2 , where the production results are entered into the Sap 2000 v20 analysis software program. The structure used on PL 125 floor panels. 2000, beam WF 300x150x6.5x9, column WF 400x400z13x21, the conclusion of the structure is safe based on the applicable conditions.

Konstruksi bangunan di wilayah Kediri masih cenderung menggunakan konstruksi beton dengan metode konvensional, yang rentan terhadap spesifikasi dari perencanaan struktur bangunan. Karena proses pembuatan adonan gips dan casting itu sering tidak dilakukan dengan benar sehingga dapat menghilangkan kekuatan dan struktur. Oleh karena itu, bangunan hotel direncanakan menggunakan Konstruksi Baja dan Penghapusan Lantai Pracetak, agar tidak mengurangi struktur desain spesifikasi. Dalam metode LRFD, analisis probabilitas tidak diperlukan, kecuali untuk situasi umum yang tidak diatur dalam Peraturan yang Diperoleh Perhitungan perencanaan LRFD mengacu pada SNI 1729-2015 terbaru. Berdasarkan perencanaan, struktur perhitungan pemuatan dihitung dalam m2, di mana hasil produksi dimasukkan ke dalam program perangkat lunak analisis Sap 2000 v20. Struktur yang digunakan pada panel lantai PL 125. 2000, balok WF 300x150x6.5x9, kolom WF 400x400z13x21, kesimpulan struktur aman berdasarkan kondisi yang berlaku.

References

A. Kaprina, S. Winarto, and Y. Cahyo, “ANALISA PRODUKTIFITAS ALAT BERAT PADA PROYEK PEMBANGUNAN GEDUNG FAKULTAS SYARIAH DAN ILMU HUKUM IAIN TULUNGANGUNG,†Jurmateks, vol. 1, no. 1, pp. 1–11, 2018.

W. Dewobroto, “Perancangan balok beton bertulang dengan SAP 2000,†2013.

G. H. Cahyo, “Perhitungan perencanaan Struktur Gedung Beton bertulang Di Jalan Ahmad Yani Pontianak.†Tanjungpura University, 2010.

I. W. Suasira, I. M. S. Kader, and I. M. Jaya, “Perbandingan Desain Struktur Beton Bertulang yang Dibebani Dinding Pasangan Bata Merah Dengan Bata Ringan Dengan Menggunakan Program SAP 2000,†Log. J. Ranc. Bangun dan Teknol., vol. 16, no. 2, p. 126, 2017.

A. Dolu and H. Hasan, “Metode Elemen Hingga Dengan Program Matlab dan Aplikasi Sap 2000 Untuk Analisis Struktur Cangkang,†SMARTek, vol. 8, no. 2, 2010.

A. I. Candra, A. Yusuf, and A. R. F, “Studi Analisis Daya Dukung Pondasi Tiang Pada Pembangunan Gedung Lp3m Universitas Kadiri,†CIVILLa, vol. 3, no. 2, pp. 166–171, 2018.

J. S. Muda, M. S. Gumilar, and F. Dhiniati, “Perencanaan Struktur Gedung Kantor Dishub Kota Pagar Alam Berbasis Program SAP 2000,†J. Ilm. BERING’S, vol. 4, no. 02, pp. 51–67, 2017.

F. Faizah, “EVALUASI KINERJA STRUKTUR BETON DENGAN ANALISIS PUSHOVER PADA GEDUNG CIPTA KARYA TATA RUANG DAN KEBERSIHAN KABUPATEN PACITAN MENGGUNAKAN PROGRAM SAP 2000,†J. KONTRUKSI, vol. 2, no. 1, 2014.

I. Hidayat, M. Suangga, F. Leonardo, and G. Juliastuti, “THE COMPARISON OF SLAB DEFLECTION BASED ON FIELD MEASUREMENT, MANUAL CALCULATION (LEVY METHOD) AND FINITE ELEMENT METHOD (PROGRAM SAP 2000),†J. Teknol., vol. 78, no. 5, 2016.

N. A. Setiyowati, B. Suswanto, and R. Soewardojo, “Studi Perbandingan Perilaku Profil Baja WF dan HSS Sebagai Bresing pada SCBF Akibat Beban Lateral dengan Program Bantu Finite Element Analysis,†J. Tek. ITS, vol. 1, no. 1, pp. D40–D45, 2012.

J. Galanthe, “PERHITUNGAN STRUKTUR GEDUNG RUKO 3 LANTAI JALAN DI PANJAITAN DENGAN MENGGUNAKAN METODE TAKABEYA DAN PROGRAM SAP 2000,†KURVA S J. Mhs., vol. 4, no. 1, pp. 602–608, 2015.

F. Ramdhani, “PELATIHAN PENGGUNAAN SOFWARE STRUCTURAL ANALYSIS PROGRAM (SAP) PADA STRUKTUR BANGUNAN GEDUNG DI SEKOLAH MENENGAH KEJURUAN NEGERI 2 DUMAI,†J. Pengabdi. Masy. Multidisiplin, vol. 1, no. 1, pp. 72–80, 2017.

P. Lumba, “ANALISIS BANGUNAN TIDAK SIMETRIS DALAM MEMIKUL GAYA GEMPA DENGAN MENGGUNAKAN SAP 2000,†J. APTEK, vol. 2, no. 1, pp. 72–77, 2014.

W. Apriani, “Pelatihan SAP 2000 Dalam Perencanaan Konstruksi Gedung Beton Bertulang Dan Baja Tahan Gempa Berdasarkan Sni 03-1726-2012,†Padang. Pros. Konf. Nas. PKM CSR ke, vol. 2, 2016.

B. Mardiyanto, “Studi Perilaku Pelat Beton Di Atas Tanah Dengan Metode Elemen Hingga (Sap 2000 V. 11.0. 0) Ditinjau Pada Variasi Modulus Reaksi Subgrade (Kv) dan Mutu Pelat Beton,†2010.

N. Pertiwi, “PENERAPAN APLIKASI SAP2000 PADA MATA KULIAH STRUKTUR BETON GEDUNG MELALUI METODE PELATIHAN PADA MAHASISWA PTSP FT UNM,†J. MEKOM (Media Komun. Pendidik. Kejuruan), vol. 3, no. 2, 2016.

A. S. Dermawan and D. Yuniar, “ANALISIS STRUKTUR PORTAL GUDANG KARET MENGGUNAKAN SAP 2000,†Polhasains J. sains dan Terap. Politek. Hasnur., vol. 3, no. 02, pp. 1–7, 2015.

A. I. Candra and E. Siswanto, “Rekayasa Job Mix Beton Ringan Menggunakan Hydroton dan Master Ease 5010,†CIVILLa, vol. 3, no. 2, pp. 162–165, 2018.

Y. A. Adhitama, E. Purwanto, and A. Supriyadi, “Analisis Kinerja Gedung Bertingkat Berdasarkan Eksentrisitas Lay Out Dinding Geser Terhadap Pusat Massa Dengan Metode Pushover,†Matriks Tek. Sipil, vol. 4, no. 1, 2016.

J. S. Muda, M. S. Gumilar, and V. Iteridi, “PERENCANAAN STRUKTUR GEDUNG BARU KANTOR DISHUB KOTA PAGAR ALAM 4 LANTAI BERBASIS PROGRAM SAP 2000,†J. Berings, vol. 6, no. 2, pp. 26–31, 2017.

F. Aribisma, I. G. P. Raka, and T. Tavio, “Evaluasi Gedung MNC Tower Menggunakan SNI 03-1726-2012 dengan Metode Pushover Analysis,†J. Tek. ITS, vol. 4, no. 1, pp. D71–D75, 2015.

I. Widiasanti and S. Musalamah, “PERBANDINGAN BERAT KUDA-KUDA BAJA ATAP LIMAS MENGGUNAKAN APLIKASI SAP 2000 –2 DIMENSI DENGAN 3 DIMENSI,†J. Menara, vol. 5, no. 1, p. 15, 2010.

E. K. Pangestuti, R. K. Kusumawardani, A. Priaji, and D. L. Nikmah, “Perbandingan Analisa Perhitungan Beton Struktural pada Proyek Pembangunan Gedung F Universitas Pekalongan,†J. Tek. Sipil dan Perenc., vol. 18, no. 2, pp. 159–164, 2016.

T. Y. Purnomo, L. D. Krisnawati, and Y. C. S. Purnomo, “Kajian Jembatan Kecamatan Sendang (Ruas Jalan Tugu-Pabyongan) Kabupaten Tulungagung dengan Metode Komposit,†J. Manaj. Teknol. Tek. Sipil, vol. 1, no. 1, pp. 112–125, 2018, doi: 10.30737/jurmateks.v1i1.145.

Downloads

PlumX Metrics

Published

2018-06-29

Issue

Section

Articles