Optimalisasi Rencana Anggaran Biaya pada Perumahan Central Raya Tiban Menggunakan Perhitungan SNI dan Kontraktor

Authors

  • Delvina Luo Faculty of Civil Engineering and Planning, Batam International University
  • Jody Martin Ginting Faculty of Civil Engineering and Planning, Batam International University
  • Amanatullah Savitri Faculty of Civil Engineering and Planning, Batam International University

DOI:

https://doi.org/10.30737/jurmateks.v5i1.2576

Keywords:

Construction Budget Planner, Contract Analysis of Unit price, Contractor, SNI

Abstract

In the construction project, construction management is needed in order to get results that are in accordance with the objectives of the development. One of the elements of project management is cost management. Poor cost management can lead to cost overruns or over budgets to the detriment of project owners and contractors. One of the methods that can be used in preparing the project cost budget is the SNI calculation and the contractor's calculation. The purpose of this study was to determine the comparison of the budget plan using the SNI method and the contractor's calculation. The research was conducted by collecting data on the Central Raya Tiban housing development project. Furthermore, an analysis using the SNI and contractor is carried out and compares the results of the calculations of the two methods. The results of the study obtained that the estimated cost budget plan from the calculation of the contractor was Rp. 283,827,332, while the results with the SNI were Rp. 330,333,371. From these data, it can be seen that the contractor's calculation is more optimal when compared to the calculation of SNI with a difference of Rp. 46,506,039 or 14.08% of the total value of the estimated cost budget based on the SNI calculation method. This can be used as a reference in preparing a cost budget in order to reduce development or project costs so that they become optimal and in accordance with the wishes of the project owner.

References

Albi Akbar, “Perbandingan Rencana Anggaran Biaya Metode BOW dan SNI pada Proyek Pembangunan RKB SDN 005 Kaliorang Kabupaten Kutai Timur,†Kurva S, vol. 11, no. 2, pp. 1–11, 2020, [Online]. Available: https://webcache.googleusercontent.com/search?q=cache:BDsuQOHoCi4J:https://media.neliti.com/media/publications/9138-ID-perlindungan-hukum-terhadap-anak-dari-konten-berbahaya-dalam-media-cetak-dan-ele.pdf+&cd=3&hl=id&ct=clnk&gl=id.

A. A. Saputra, D. Nugroho, and F. Sukmana, “Perbandingan Estimasi Anggaran Biaya Antara Harga SNI Dengan Harga Kontraktor Pada Proyek Pembangunan Pagar di Kandangan Surabaya,†J. Keilmuan dan Terap. Tek., vol. 09, no. 01, pp. 21–29, 2020.

A. Aprilia, M. R. Siddiq, R. Eka Hamdani, N. S. Nugroho, Paikun, and J. Jasmansyah, “Regression Model of Shop-house Construction Costs and Percentage of Building Component Costs,†5th Int. Conf. Comput. Eng. Des. ICCED 2019, pp. 4–9, 2019, doi: 10.1109/ICCED46541.2019.9161131.

S. H. Ji, J. Ahn, H. S. Lee, and K. Han, “Cost Estimation Model Using Modified Parameters for Construction Projects,†Adv. Civ. Eng., pp. 1–10, 2019, doi: 10.1155/2019/8290935.

G. Natalia et al., “Pengaruh Kinerja Konsultan Manajemen Konstruksi Terhadap Ketepatan Waktu Pelaksanaan Proyek (Studi Kasus : Tiga Proyek Pembangunan Gedung Komersial di denpasar dan Badung),†Proceedings, vol. 1, no. 1, 2020.

S. Tayefeh Hashemi, O. M. Ebadati, and H. Kaur, “Cost estimation and prediction in construction projects: a systematic review on machine learning techniques,†SN Appl. Sci., vol. 2, no. 10, pp. 1–27, 2020, doi: 10.1007/s42452-020-03497-1.

H. Ahn, S.

PlumX Metrics

Published

2022-07-19

Issue

Section

Articles