Efisiensi Harga Satuan Pekerjaan Konstruksi Gedung Dengan Metode BOW (Burgerlijke Openbare Werken), SNI (Standart Nasional Indonesia) Dan Lapangan

Authors

  • Nova Irmayanti Faculty of Engineering, Kadiri University
  • Ahmad Ridwan Faculty of Engineering, Kadiri University
  • Yosef Cahyo Setianto Poernomo Faculty of Engineering, Kadiri University
  • Haris Wicaksono Faculty of Engineering, Kadiri University
  • Fitry Rahmawaty Faculty of Engineering, Kadiri University

DOI:

https://doi.org/10.30737/jurmateks.v4i2.2022

Keywords:

Building, Construction, Cost Efficiency, Unit Price of Work

Abstract

Construction management is very necessary in project management. To increase the efficiency and effectiveness of construction development activities, a unit price calculation tool is needed, namely construction cost analysis. Contractors generally make bid prices based on analysis that is not entirely guided by BOW (Burgerlijke Openbare Werken) analysis or SNI (Standart National Indonesia) analysis. Contractors tend to calculate the unit price of work using their own analysis which is based on previous experience in completing a construction work. The purpose of this study was to analyze the unit price of work on the building using the SNI, BOW and Field methods. The work components analyzed in this study are the unit price of materials and wages for partner work and foundation work. In each calculation method used, the most economical cost budget plan is obtained, namely using the field method calculation with the unit price value for the work of a partner, it costs Rp. 509.9996.78 while for foundation work it costs Rp. 722,965.1. By using the field method, a unit price is more economical when compared to BOW and SNI methods. So that these results can be used as a reference in planning the budget for a construction project.

References

K. P. Fattah, A. K. Al-Tamimi, W. Hamweyah, and F. Iqbal, “Evaluation of sustainable concrete produced with desalinated reject brine,†Int. J. Sustain. Built Environ., vol. 6, no. 1, pp. 183–190, 2017, doi: 10.1016/j.ijsbe.2017.02.004.

B. Zakariyya, A. Ridwan, and S. Suwarno, “Analisis Biaya Dan Jadwal Proyek Pembangunan Gedung Dinas Kesehatan Kabupaten Trenggalek Dengan Metode Earned Value,†J. Manaj. Teknol. Tek. Sipil, vol. 3, no. 2, p. 362, 2020, doi: 10.30737/jurmateks.v3i2.1197.

D. Mizutani, Y. Nakazato, and J. Lee, “Network-level synchronized pavement repair and work zone policies: Optimal solution and rule-based approximation,†Transp. Res. Part C Emerg. Technol., vol. 120, no. June, p. 102797, 2020, doi: 10.1016/j.trc.2020.102797.

R. Liu, X. Li, and S. Chen, “Extension Analysis of Manufacturing Cost and Construction of basic-elements Model,†Procedia Comput. Sci., vol. 162, no. 2019, pp. 156–165, 2019, doi: 10.1016/j.procs.2019.11.271.

H. R. Agustapraja et al., “Perbandingan Estimasi Anggaran Biaya Dengan Metode SNI dan Bow Pada Proyek Pembangunan Gedung D Fakultas Agama Islam Universitas Islam Lamongan,†UKaRsT, vol. 1, no. 2, pp. 84–93, 2017.

G. Ma, M. Wu, Z. Wu, and W. Yang, “Single-shot multibox detector- and building information modeling-based quality inspection model for construction projects,†J. Build. Eng., vol. 38, no. January, 2021, doi: 10.1016/j.jobe.2021.102216.

M. Aziz, S. Winarto, Y. C. Setianto Poernomo, and A. I. Candra, “Studi Analisa Perencanaan Perkerasan Lentur Dan Rencana Anggaran Biaya (Pada Proyek Jalan Ruas Jalan Tembelengan–Durjan Kabupaten Sampang),†J. Manaj. Teknol. Tek. Sipil, vol. 2, no. 2, p. 235, 2019, doi: 10.30737/jurmateks.v2i2.515.

T. S. T. Imany, Y. M. Hadi, and A. Zakaria, “Analisis Harga Satuan Pekerjaan Jalan dan Jembatan Menggunakan Program Lazarus (studi kasus devisi 3, 5, 6 & 7),†J. Rekayasa Sipil Dan Desain, vol. 1, no. 1, pp. 1–8, 2016.

R. Ajiono, “Analisis Faktor Risiko Penawaran Di Bawah Estimasi Terhadap Kinerja Kualitas Proyek Konstruksi Bangunan di Kota Trenggalek Jawa Timur,†UKaRsT, vol. 2, no. 2, p. 70, 2018, doi: 10.30737/ukarst.v2i2.373.

F. Roehman, “Analisa Harga Satuan Pekerjaan dengan Metode BOW, SNI, DAN Lapangan (Pekerjaan Beton Bertulang Pada Pembangunan Rumah Tinggal Perum Bugel, Jepara),†J. Tek. - UNISFAT, vol. 7, no. 1, pp. 14–23, 2017.

J. Harmawanto, Y. C. S. Poernomo, and S. Winarto, “Analisa Anggaran Biaya Danpenjadwalanproyek Perbaikan Tanggul Kali Bakungdesa Cengkok Kecamatan Tarokan Kabupaten Kediri,†J. Manaj. Teknol. Tek. Sipil, vol. 2, no. 2, pp. 224–234, 2019.

Y. C. S. Poernomo, A. Ridwan, Z. Lubis, A. Gunarto, and S. Winarto, “Pelaksanaan Manajemen Konstruksi Pada Proyek Pembangunan Bank Sinar Mas Kediri,†UKaRsT, vol. 2, no. 1, p. 52, 2018, doi: 10.30737/ukarst.v2i1.101.

N. Alami, U. A. Aziz, and D. Margiarti, “Studi Komparasi Perbandingan Rencana Anggaran Biaya Antara Metode Analisa Harga Satuan Pekerjaan ( AHSP ) Dan Standar Nasional Indonesia ( SNI ),†Surya Bet. J. Ilmu Tek. Sipil, vol. 5, no. 1, pp. 10–19, 2021.

W. R. Putra, A. Ridwan, Y. Cahyo, and A. I. Candra, “Studi Pelaksanaan Kinerja Percepatan Waktu Pada Proyek Pembangunan Gedung Bank Darah Rumah Sakit Dr. Soedomo,†J. Manaj. Teknol. Tek. Sipil, vol. 3, no. 1, pp. 76–85, 2020, doi: 10.30737/jurmateks.v3i1.892.

E. Gardjito, “Role Of Projectrelated Parties On Quality Control ( Concrete Structure ) And Project Performanceachievement,†UKaRsT, vol. 2, no. 1, pp. 47–56, 2018.

I. Kania, “Analysis Of Parking Management Policy In Garut Regency,†J. Ilm. Nas., vol. 3, no. 3, pp. 12–19, 2021.

Y. Juansyah, D. Oktarina, and M. Zulfiqar, “Analisis perbandingan Rencana Anggaran Biaya bangunan menggunakan metode SNI dan BOW (Studi kasus: Rencana Anggaran Biaya bangunan gedung Kwarda Pramuka Lampung),†Tek. Sipil, Fak. Tek. Univ. Malahayati, vol. 1, no. 1, pp. 1–5, 2017.

N. Nasrul, “Studi Analisa Harga Satuan Pekerjaan Beton Dengan Metode BOW , SNI Dan Lapangan,†J. Momentum ISSN 1693-752X, vol. 15, no. 2, pp. 103–114, 2017.

D. Sekarsari, J. B. Mangare, and R. L. Ingikiriwang, “Analisis Perbandingan Biaya Nyata Dengan Sni, Pembangunan Ruko Di Daerah Sorong Papua Barat Terhadap Daerah Manado Sulawesi Utara,†J. Sipil Statik, vol. 6, no. 12, pp. 1113–1118, 2018.

M. R. Putra and N. A. Affandy, “Perbandingan Estimasi Anggaran Biaya Dengan Metode Sni Dan Bow,†J. CIVILA, vol. 2, no. 1, 2017, doi: 10.30736/cvl.v2i1.41.

J. Bokko, “Analisis Perbandingan Efisiensi Biaya Dan Metode Pelaksanaan Konstruksi Jalan Aspal Beton Dengan Rigid Beton,†J. Dyn. Saint, vol. 3, no. 1, pp. 548–564, 2018, doi: 10.47178/dynamicsaint.v3i1.276.

I. A. Rahman and H. Warman, “Perbandingan Estimasi Anggaran Biaya Dengan Memakai Analisa SNI dan Analisa BOW,†Abstr. Undergrad. Res. Fac. Civ. Plan. Eng. Bung Hatta Univ., vol. 2, no. 2, 2018.

N. F. E. Ningtyas and S. Haris, “Analisis Tebal Lapis Perkerasan Jalan dengan Meninjau Sifat Fisik Agregat Lapis Fondasi Bawah pada Ruas Jalan Sofi-Wayabula Pulau Morotai. (Hal. 97-107),†RekaRacana J. Tek. Sipil, vol. 5, no. 3, p. 97, 2019, doi: 10.26760/rekaracana.v5i3.97.

A. Mufaris, F. Prihesnanto, and E. Darma, “Perbandingan Estimasi Anggaran Biaya Antara Bow, Sni Dan Metode Perhitungan Kontraktor Pada Proyek Rumah Susun (Rusun) Pulogebang Jakarta Timur,†Bentang, vol. 4, no. 1, p. 262556, 2016.

A. Ridwan and R. Ajiono, “Pengendalian Biaya Dan Jadual Terpadu Pada Proyek Konstruksi,†UKaRst, vol. 1, no. 1, pp. 74–83, 2017.

PlumX Metrics

Published

2021-10-31

Issue

Section

Articles